Letters from stakeholders addressed to the Executive Board

Communications from stakeholders addressed to the CDM Executive Board

In accordance with the “Procedure: Direct communication with stakeholders”, stakeholders may communicate directly with the CDM Executive Board on the understanding, application and development of CDM rules and the implementation of project activities and programmes of activities (PoAs), e.g., technical or operational explanation, suggestions/ proposals for new regulations, using the “Stakeholder communication form” (CDM-COM-FORM), available under the CDM webpage, Rules and Reference section, under the Forms sub-section, here

The completed form (CDM-COM-FORM) and any supplemental documents shall be submitted electronically to cdm-info@unfccc.int, or via fax to +49-228-815-1999 or via post to: Sustainable Development Mechanism (SDM) Programme, UNFCCC secretariat, P.O. Box 260124, D-53153 Bonn, Germany.

 Below are the communications initiated by stakeholders.

Date of submissionName/Organization of the submitterSubjectResponse

18 July 2022

Mr. K. R. Nair, Indian Wind Power Association

INQ-11488_Transition from a fixed 10-year crediting period to 21-year crediting period

 

16 May 2022

Ms. Olivia Tuchten, Promethium Carbon

INQ-11417_Request for voluntary cancellation for request for issuance cases with 'provisional' status

INQ-11417_Response_EB115

 

20 April 2022

Mr. Sven Kolmetz, Project Developer Forum

INQ-11492_Request for voluntary cancellation for request for issuance cases with 'provisional' status

INQ-11492_Response_EB115

2 December 2021

Mr. Juan Carlos Echeverri Diaz, MetroCali S.A.

 INQ-11132_Request for extension of deadline for renewal of crediting period for PA 0170

 INQ-11132_Response

INQ-11132_Response_EB113

 

8 October 2021

Ms. Rosemary Nyambura Wambui, Individual

 

INQ-11177_Request for Transparency

 INQ-11177_Response

 

6 October 2021

Mr. Juan Ignacio Moran, Palmatir S.A.

INQ-10989_Request for extension of deadline for renewal of crediting period for PA 9336

INQ-10989_Response

19 August 2021

Mr. Jung Taiwoo, Sejingne Co. Ltd.

INQ-10969_Project registration

 INQ-10969_Response

18 August 2021

Ms. Roberta Bonomi, Enel Brasil Participações Ltda

INQ-10966_Request for extension of RCP deadline for PA 9064

INQ-10966_Response  

10 August 2021

Mr. Luis De Valdivia Castro, Ecoener Ingeniería, Sociedad Anónima

INQ-10945_Monitoring procedure for a project built with a larger capacity than the registered project

 INQ-10945_Response

 INQ-10945_Response 2

28 May 2021

Mr. Ashwani Kumar Goel, M/s Door Sanchar Hydro Power Private Limited

INQ-10786_Request for extension of deadline for renewal of crediting period for PA 6048

 INQ-10786_Response

 

4 May 2021 

Mr. Jose Luis Fuentes Perez, AENOR

INQ-10760_Extension of relaxation of requirements for mandatory site visits due to pandemic

 INQ-10760_Response_EB110

15 April 2021

Mr. Harry Clemens, African Clean Energy Switch - Biogas (ACES-Biogas) Limited

INQ-10733_Extension of the deadline for renewal of the included CPA 8239-P1-0001-CP1

 INQ-10733_Response

23 March 2021

Mr. Nobuo Kurashige, JAL

INQ-10650_List of CERs satisfied with CORSIA Eligible Emissions Units

 INQ-10650_Response

 

26 February 2021

Mr. Ramkrishna Patil, EKI Energy Services Ltd.

INQ-10612_To process requests for registration for already submitted projects for registration under temporary measures and complete analysis of submission as provisional

 INQ-10612_Response

11 February 2021

Mr. Ramkrishna Patil, EKI Energy Services Ltd.

 

INQ-10581_Public availability of credit reconciliation project history, Ease of MOC update and non-issuance of HCA from Other Parties Involved

 INQ-10581_Response

1 February 2021

Mr. Nuno Barbosa, UniCarbo - Energia e Biogás Ltda.

INQ-10555_Extension of deadline for renewal of crediting period for PAs 9295, 9298 and 9302

INQ-10555_Response

15 January 2021

Mr. Ho Hyun Bae, SK Engineering & Construction Co. Ltd.

INQ-10514_Inclusion of a CPA and issuance of "Provisional" CERs

 INQ-10514_Response

10 January 2021

Mr. Nuno Barbosa, UniCarbo - Energia e Biogás Ltda.

 

 INQ-10508_Extension of deadline for the submission of requests of renewal of crediting period for PA 8205

 

 INQ-10508_Response

 

31 December 2020

Mr. Venkata Harinadh Manchineni

 
INQ-10494_Request of cancellation for CDM credits for PA 0396

 INQ-10494_Response

14 December 2020

Ms. Pooja Verma, C-Quest Capital

INQ-10455_Assessment of Additionality at the time of renewal of PoA Period

 INQ-10455_Response

10 December 2020

Mr. Nuno Barbosa, UniCarbo - Energia e Biogás Ltda.

INQ-10444_Extension of the currently valid deadline for the submission of requests of renewal of crediting period

 INQ-10444_Response

8 December 2020

Mr. Samuel Bell, VITALITE Zambia

 

INQ-10436_Deadline for CPA post registrations changes following PoA-PRC.

 
INQ-10436_Response

4 December 2020

Mr. Juan Carlos Echeverri Diaz, Metro Cali S.A.

INQ-10432_Request to extend the deadline for renewal of crediting period: PA 5852

 INQ-10432_Response

 

1 December 2020

Ms. Sofía Irigoyen, Hidroibérica S.A.

INQ-10424_Request to extend deadline for post registration changes for PA 9439

 
INQ-10424_Response 

1 December 2020

Mr. Leonardo Cleaver de Athayde, Head of Delegation for Brazil and Director of the Department of Environment, Ministry of Foreign Affairs, The Government of Brazil

INQ-10423_The future of the CDM and the CDM Executive Board

 

 INQ-10423_Response_EB108

 

30 November 2020

Mr. Kommareddy Kishore Reddy

INQ-10411_Withdrawal of complaints/legal communication


 INQ-10411_Response

23 November 2020

Mr. Carlos Fuller, AOSIS

INQ-10395_Stakeholder input - CDM EB discussions on post-2020 CDM functioning


 INQ-10395_Response 

5 November 2020

Mr. Rogier Van Meenen, RDP Development BV

INQ-10364_Request to extend the deadline for renewal of crediting period: PA 5354

INQ-10364_COM_FORM_rev

 INQ-10364_Response

INQ-10364_Response_2 

 

22 October 2020

Mr. Naveen Dhingra, Individual

INQ-10319_Re: Saving Integrity of CDM and protectin the environment

 INQ-10319_Response

29 September 2020

Mr. Ramkrishna Patil, EKI Energy Services Ltd.

INQ-10253_Provision to have Modalities of Communication (MoC) at CPA level on Voluntary basis

 INQ-10253_Response

 

22 September 2020

Mr. Juan Carlos Echeverri Diaz, MetroCali S.A.

 

INQ-10221_Request for extension of the term for the renewal of the accreditation period from September 30, 2020 to September 30, 2021

INQ-10221_Response_EB107

22 September 2020 

Mr. Rahul Kar, Deloitte

INQ-10215_True Up Period for CP2

 INQ-10215_Response

INQ-10215_Response_2

19 September 2020

Ms. Nicole Wilke, Head of Delegation Germany and Mr. Jacob Werksman, Head of Delegation of the European Union

INQ-10208_CDM registration and issuance of CERs related to mitigation activities beyond 2020

  INQ-10208_Response

INQ-10208_Response_2 

16 September 2020

Mr. Marc Sadler, The World Bank

 

INQ-10189_Continuation of CDM post-2020

 INQ-10189_Response

INQ-10189_Response_2 

 

15 September 2020

Mr. Ferdinand Heilig, Heilig Assets GmbH

 

 

 

INQ-10177_Registration after 31.12.2020

 INQ-10177_Response

INQ-10177_Response_2 

 

14 September 2020

 Mr. Yuki Kabe, Braskem

 

INQ-10176_Feedback on NM0378

 

 INQ-10176_Response

 

21 August 2020

Mr. Gerald Dunkel-Schwarzenberger, CARBON Climate Protection GmbH

 

INQ-10126_Continuance of the CDM beyond 2020

 INQ-10126_Response

INQ-10126_Response2_EB107

 

14 August 2020

Mr. Kishore Reddy, Freelance Consultant

INQ-10106_Communication-Legal

 INQ-10106_Response

 

12 August 2020

Ms. Claire Bae, Ecosian Co. Ltd.

 

INQ-10101_Question about CDM Registration related to the transition from CDM to SDM

 INQ-10101_Response

INQ-10101_Response2_EB107

 

 4 August 2020

Mr. Derrick Forrister, International Emissions Trading Association

INQ-10078_Clarity on CDM operations beyond 2020

INQ-10078_Response

INQ-10078_Response2_EB107

31 July 2020

Mr. Rohit Lohia, Climate Secure India Private Limited

INQ-10071_Future of CDM after 31 December 2020

 INQ-10071_Response

INQ-10071_Response2_EB107

 17 July 2020

Mr. Manish Dabkara, EKI Energy Services Limited

INQ-10048_Request to change in upfront issuance fee model for project activity and program activity

 INQ-10048_Response

 7 July 2020

Mr. Dario Fernando Acosta Chamorro, MEGABÚS S.A.

 

INQ-10013_Request for extension of the term for the renewal of the accreditation period from September 30, 2020 to September 30, 2021

INQ-10013_Response

INQ-10013_Response2_EB107

6 July 2020

Mr. Valery Matveev, Noologistics

INQ-10004_Renewable Energy Source Self-Reproduction Ratio as an UNFCCC Process Tool

INQ-10004_Response

 1 July 2020

 

 Mr. William Farmer, Uganda Carbon Bureau

INQ-09994_Confirmation to use AMS-I.E version 10.1 in the RCP updating of the PoA DD (re: SSC756) thereby allowing theeligibility of solar electric cookers under the PoA

 INQ-09994_Response

5 June 2020

Mr. Manish Dabkara, EKI Energy Services Limited

INQ-09917_Request for an extension of deadline for renewal of crediting period from 30 September 2020

 INQ-09917_Response1

INQs-09917_10255_Response2

 

 1 June 2020

Mr. Joao Sprovieri, BENG Engenharia

 

INQ-09903_Extension of relax mandatory site visits by DOEs period

 

 INQ-09903_Response 1

INQ-09903_Response 2

 

20 May 2020

Mr. Nuno Barbosa, UniCarbo - Energia e Biogás Ltda.

INQ-09884_Extension of 31 August 2020 deadline for submission of a request for approval by the Board

 INQ-09884_Response

INQ-09884_Response2

10 May 2020

Mr. Ghassan Afyouni, Steel Wood Industries FZCO (Dubai Branch)

INQ-09849_Requesting the Inclusion of a Scalable and Economical Carbon Capture System under the UNFCCC Project Directory

 INQ-09849_Response_unsigned

 4 May 2020

Mr. Sven Kolmetz, Project Developer Forum

INQ-09831_Operational Continuation of CDM beyond 2020

 INQ-09831_Response_unsigned

 4 May 2020

Mr. Flip Viljeon, City of Ekurhuleni Metropolitan Municipality

INQ-09830_Request to extend deadline to renew crediting period of "overdue cases"

 INQ-09830_Response_unsigned

INQ-09830_Response2

INQ-09830_Response3_EB107

 30 April 2020

Mr. Raja Gopal Reddy, Last Rites (India) Services Private Limited

 

INQ-09826_Last Rites Cow Dung Cremation Project in India

 

 INQ-09826_Response_unsigned

INQ-09826_Response2_EB107

 28 April 2020

Mr. Nuno Barbosa, UniCarbo Energia e Biogas Ltda.

INQ-09818_Suggestion of extending the currently valid deadline for the submission of requests of renewal of crediting period

 INQ-09818_Response_unsigned

INQ-09818_Response2

INQs-09818_10254_Response3_EB107

 

24 April 2020

Mr. Luiz Xavier, Braskem

INQ-09813_Request to reconsider the assessment of NM0378 - "green plastic"

INQ-09813_Response_EB106

INQ-09813_Response_unsigned

15 April 2020

Mr. Thomas Morton, ClimateCare Limited (on behalf of Project Developer Forum)

INQ-09806_Field surveys in the time of COVID-19

INQ-09806_Response_EB106

INQ-09806_Response_unsigned

2 April 2020

Mr. Jae Hyun Nam, WECOS Co. LTD.

INQ-09711_Conduct method of Local Stakeholder Consultation under the COVID 19 pandemic

INQ-09711_Response_unsigned

16 March 2020

Mr. Havard Norstebo, Green Development AS

INQ-09670_CDM monitoring process requirements may contribute to enhancing the Corona pandemic in Africa

 INQ-09670_Response_unsigned

16 March 2020

Mr. Sven Kolmetz, Project Developer Forum

INQ-09667_Request for Alternatives to On-Site Inspection Date to Global Travel Restrictions

 INQ-09667_Response1_unsigned

INQ-09667_Response2_unsigned

15 March 2020

Mr. Werner Betzenbichler, DOE Forum

INQ-09662_Lifting of requirements regarding on-site inspections because of travel restrictions caused by Covid-19

 INQ-09662_Response1_unsigned

INQ-09662_Response2_unsigned

6 March 2020

Ms. Katrin Mikolajewski, atmosfair GmbH

INQ-09626_2nd Request for Renewal of Special Permission for Monitoring and Verification in Conflict Zones

INQ-09626_Response

 INQ-09626_Response_unsigned

15 January 2020

Mr. William Farmer, Improved Cook Stoves for East Africa (ICSEA) Ltd

 INQ-09383_Addition of methodology AMS-I.K to PoA 7014 as a post-registration change together with the renewal of the PoA   INQ-09383_Response

23 December 2019

Mr. Sai Kishore Nellore, VEDA Climate Change Solutions Ltd

INQ_09330_Issuance of tCERs  INQ-09330_Response 

20 November 2019

Ms. Magdalena Garcia Mora, Mr. Gavin Lee and Mr. Pedro Benitez Estebanet, Acciona

INQ-09222_Digitalization of Monitoring Review and Verification for Issuance using Blockchain


 INQ-09222_Response
18 November 2019

Mr. Nuno Barbosa, UniCarbo Energia e Biogás Ltda.

INQ-09214_Allowing more than 3 payment instalments for SOP under cases in which the amount of CERs under the issuance request is higher than 15,000

INQ-09214_Response_EB106

 INQ-09214_Response

31 October 2019

Mr. Stanley Lin, Sindicatum Carbon Capital Ltd

INQ-09148_Time  extension request for the renewal  process of CDM project ref no. 3193

 INQ-09148_Response

INQ-09148_Response_EB105

29 October 2019

Mr. Owen Parsson

INQ-09145_Inquire explanation of Type L+ and Type L-

 INQ-09145_Response
25 October 2019 Mr. Augustin Calle, APPLUS+ Certification

INQ-09136_Exemption regarding the necessity of site visit due to unsafe situation and terrorism

 INQ-09136_Response

INQ-09136_Response_EB105

23 September 2019 Ms. Anuradha Mittal, Oakland Institute

INQ-09024_End Certification of the Kachung Forest Project

Setting_the_Record_Straight_2019

Carbon_Colonialism_2017

Darker_Side_Green_2014

Evicted_Carbon_Credits_2019

 INQ-09024_Response
8 August 2019 Ms. Maria Kolos INQ-08905_Submission to ICAO for CORSIA on behalf of CDM  INQ-08905_Response
26 July 2019 Mr. Sai Kishore Nellore, VEDA Climate Change Solutions Ltd INQ-08881_Issuance of tCERs  INQ-08881_Response
26 July 2019 Mr. Sven Kolmetz, Project Developers Forum INQ-08882_Process for renewal of crediting period and penalty of "unclaimable period"

 INQ-08882_Response

INQ-08882_Response_EB104

INQ-08882_Response_EB105

13 May 2019 Mr. Havard Norstebo, Green Development AS INQ-08656_Payment of Share of Proceeds  INQ-08656_Response
2 May 2019 Ms. Alexandra Nuske, TUEV NORD INQ-08594_Negative tCERs  INQ-08594_Response
29 March, 2019 Mr. Dietrich Brockhagen, atmosfair GmbH INQ-08508_Request for Renewal of Special Permission for Monitoring and Verification in Conflict Zones

 INQ-08508_Response

INQ-08508_Response_EB103

28 September, 2018 Mr. Hwang Jaeseung, South Korea INQ-08043_Queston about project process  INQ-08043_Response 
24 September, 2018 Mr. Jayanth Srivatsa, India INQ-08016_Avaliability of carbon credits for industrial units  INQ-08016_Response 
11 August, 2018 Mr. M.R. Thiyagarajan, Fuel Economy Thiyagarajan INQ-07868_Clean Development Mechanism (CDM) - Availing of Carbon Credit  INQ-07868_Response
12 July, 2018 Mr. Alexis Leroy, ALLCOT Group INQ-07822_New CDM issuance rules penalise developers and discriminate against smaller companies

 INQ-07822_Response

INQ-07822_Response_EB104

10 May, 2018 Mr. Adelino Ricardo Esparta, EQAO INQ-07639_New project activity in the same physical or geographical location at which a project activity whose crediting period has expired existed INQ-07639_Response
23 April, 2018 Mr. Rahul Rai, Ecoeye, Myanmar INQ-07565_Micro-scale units in small-scale projects  INQ-07565_Response
1 March, 2018 Mr. Prudencio III Calado, Land bank of the Philippines INQ-07258_Letter reply to UNFCCC re PGEP SLF CPA

 INQ-07258_Response

INQ-07258_Response (2)

6 February, 2018 Ms. Maria Kolos, Thomson Reuters INQ-07208_CERs cancellation  INQ-07208_Response
26 January,  2018 Mr. Prudencio III Calado, Land bank of the Philippines INQ-07171_Compliance with PoA-PS §168-169 for a CPA under inclusion  INQ-07171_Response
1 December, 2017 Ms. Molly Byrne, The Converging World, United Kingdom INQ-07082_Intention to sell Wind Farm  INQ-07082_Response
5 October, 2017 Mr. Won-Tae Kim, Korea Environement Corporation (KECO) INQ-06940_Seeking guidance from the Board to change eligibility in PoA-DD, and asking clarification about actual data

 INQ-06940_Response

INQ-06940_Response (2)

27 July, 2017 Ms. Kellan Lyman INQ-06686_ASB0008 - AWD in the Philippines  INQ-06686_Response
15 May, 2017 Mr Solomon Fekade, Addis Abeba Uiversity and Ethiopian Railways Cooperation INQ-06345_The Impacts of Electric Train Transportation on emission reduction: Case of Ethiopia - Djibouti Road Rail corridor  INQ-06345_Response
17 February, 2017 Mr. Joao Sprovieri INQ-05984_Clarification regarding the Simplified procedures to identify the baseline scenario and demonstrate additionality  INQ-05984_Response
30 November, 2016 Mr. Julio Lasso Vaccaro INQ-05645_Response to Communication CAR-GEN-163142 of October, 2016

 INQ-05645_Response

INQ-05645_Response (2)

22 November, 2016  Mr. Alexis Leroy INQ-05595_Sasol Nitrous Oxide Abatement Project  INQ-05595_Response
11 October, 2016  Mr. Jiun Jeong INQ-05310_Inquiry about possibility of CDM project  INQ-05310_Response
22 August, 2016 Mr. Sven Kolmetz INQ-05169_CDM Loan Scheme - Challenges faced and constructive inputs  INQ-05169_Response
18 June, 2016 Mr. Ambachew Fekadeneh Admassie INQ-04879_PCP rules, their differential application on applicants requesting registration from CDM's severely underrepresented region  INQ-04879_Response
14 June, 2016 Ms. Amanda Tas INQ-04859_Please cancel carbon credits deal in Uganda  INQ-04859_Response
4 June, 2016 Mr. Vivek Sadevra INQ-04830_Host Country Approval  INQ-04830_Response
14 May, 2016 Mr Aqeel Yousaf INQ-04715_Information Regarding Carbon Credit Fund For Tier-III Emission  INQ-04715_Response
Response12 May, 2016 Mr Ramkrishna Patil, EnKing, India INQ-04710_Allow to pay fees of partial CERs as per PP choice and trade it  INQ-04710_Response
Response18 May, 2016 Mr Tse-Lun Chen, Taiwan INQ-04730_The requirements of microscale projects limits  INQ-04730_Response
29 April, 2016 Mr Sunday Ogar, Ogar technology Ltd, UK INQ-04653_Solar electrification project, Nigeria  INQ-04653_Response
26 April 2016 Mr Osvaldo Jordán, Alianza para la Conservación y el Desarrollo (ACD) INQ-04645_Stakeholder comments regarding ongoing human rights concerns associated with the Barro Blanco Hydroelectric Power Plant Project (CDM Project #3237)

 INQ-04645_Response

INQ-04645_Follow-up (2)

25 March 2016 Mr. Nagendra Rao, DANS Group INQ-04559_Shift in Crediting Period Start date from 1 Jan 2010 to 30 Sept 2015  INQ-04559_Response
24 March 2016 Mr. Donghyeon Kim, YYWPC INQ-04554_Revision of crediting period from 10 years fixed to renewable crediting period(7x3) 21 years for registered project  INQ-04554_Response
5 February 2016 Mr Sven Kolmetz, PDF, United Kingdom INQ-04392_Conceptual conflicts between paragraph 78 of the CDM Project Standard, domestic rules and objectives of Local Stakeholder Consultation (LSC) and the definition of Project Starting date  INQ-04392_Response
29 January 2016 Mr Sven Kolmetz, PDF, United Kingdom INQ-04350_Completeness Check Timeline  INQ-04350_Response
20 January 2016 Mr Jonathan Hall, SGS United Kingdom Limited, UK INQ-04336_Request to withdraw: PA10078 Request for Registration

 INQ-04336_Response

INQ-04336_Response_EB88

13 December 2015 Mr Nuno Barbosa, UniCarbo - Energia e Biogás Ltda. INQ-04244_Flexibilizing the rule for starting date of renewed 7-year crediting period for project activities as an additional measure to further improve the efficiency and effectiveness of the CDM  INQ-04244_Response
6 November 2015 Ms. Katrin Mikolajewski, atmosfair GmbH INQ-04074_Request for Clarification on Monitoring and Verification in conflict zones

 04074_Response 

04074_Response_EB 87

16 October 2015 M. Ficard Ndayimirije, ACTION VOLONTAIRE POUR LA LUTTE CONTRE LES CHANGEMENTS CLIMATIQUES ET LES EFFETS NEGATIFS DU SOUFRE DU DIESEL  "AVOCHACLISD" INQ-03955_Public consultation on the Clean Development Mechanism in action on Climate Change on respecting human rights before the COP21 03955_Response
13 October 2015 Mr. John Knox, UN Special Rapporteur on human rights obligations relating to the enjoyment of a safe, clean, healthy and sustainable environment INQ-03907_Open Letter on Human Rights and Climate Change 03907_Response
9 October 2015 Ms. Eva Filzmoser, Carbon Market Watch INQ-03901_Open letter to implement UN obligations to respect human rights 03901_Response
15 September 2015 Ms. Karen Nagai, EQAO INQ-03782_DOE selection for renewing the crediting period 03782_Response 
14 September 2015 Mr. Manish Dabkara, EKI Energy Services Limited INQ-03772_Removal of Bundle Partners

03772_Response 

03772_Response _EB 86

03772_Response_EB 87

21 July 2015 Mr. Zhaoning Zheng, Goldchina Consultancy International INQ-03512_Ask to streamline and simplify the Procedures related to forwarding of CERs and Voluntary Cancellation 03512_Response
17 July 2015 Mr. Rubén González, Alianza para la Conservacion y el Desarrollo (ACD) INQ-03504_Request to support due implementation of CDM rules re #3237: Barro Blanco Hydroelectric Project

03504_Response 

03504_Follow up 

10 June 2015 Mr. Julio Alejandro Giraldo, Icontec INQ-03223_Clarification for transitional measures for the implementation of the Acreditation Standard Version 0.6 (5496)

03223_Response

03223_Response_EB 85

 

10 June 2015 Mr. Julio Alejandro Giraldo, Icontec INQ-03222_Clarification for transitional measures for the implementation of the Acreditation Standard Version 0.6 (5494)

03222_Response

03222_Response_EB 85

09 June 2015 Mr. Manish Dabkara, EKI Energy Services Limited INQ-03214_Clarifications related to Validation, Verification and SOP issues  03214_Response 
20 May 2015

Members of the European Parliament: Mr. Ignazio Corrao, Member of the Committee on Development, Ms. Eleonora Evi, Member of the Committee on Environment, Public Health and Food Safety, Ms. Heidi Hautala, Member of the Committee on Development and Mr. Jo Leinen, Member of the Committee on Environment, Public Health and Food Safety

INQ-03083_Serious concern about the Santa Rita Hydroelectric Plant (9713)

03083_Response 

03083_Follow up

11 February 2015 Mr. Jimmy Sah, EKI Energy Services Limited 383_INQ-02790_Procedure for Change in DOE for Verification activities.

383_Response

383_Response_EB 83

383_Response_EB 84

23 January 2015 Mr. Kyle Silon, DelAgua 381_INQ-02677_Request for revision to guidelines for post-registration design changes for a SSC PoAg

381_Response

381_Response_EB 83

22 January 2015 Ms. Katrin Wolf, atmosfair gGmbH 380_INQ-02675_Request of clarifications regarding section 4.8, 4.8.1 and 4.8.2 of the General Guidelines for SSC CDM methodologies, version 21.0, (CDM-EB81-A35). The clarifications are relevant for our Nigeria cookstove PoA 5067 and in general for other similar projects 
380_Response 
24 December 2014 Ms. Eva Filzmoser, Carbon Market Watch 379_INQ-02591_Request to extend deadline for call for input on the draft "Modalities and procedures for direct communication with stakeholders" (04 December 2014 to 04 January 2015, 24:00 GMT) 379_Response 
24 November 2014 Ms. Karen M. Nagai, Ecopart Assessoria em Negócios Empresariais Ltda. (EQAO) 378_INQ-02534_Starting date of PoAs  378_Response
13 November 2014 Mr. Jimmy Sah, EKI Energy Services Limited 377_INQ-02506_Clarification for 2 year intimation of projects under validation  377_Response
2 October 2014 Mr. Jimmy Sah, EKI Energy Services Limited 376_INQ-02350_Verification for projects registered under different GHG mechanisms  376_Response
6 September 2014 EKI Energy Services Limited 374_INQ-02312_Verification for bundled projects  374_Response
3 September 2014 Mr. Martin Stilkenbäumer, dock2 klima-consult 373_INQ-02304_AM0028 correct application of IPCC default value  373_Response
29 August 2014 Project Developer Forum  371_INQ-02292_Simplification of PoA Issuance  371_Response
6 August 2014 Project Developer Forum 369_Currency risk in CDM Loan Scheme  369_Response
15 July 2014 Mr. SKN Rao 367_INQ-02079_Additionality  367_Response
8 July 2014 Mr. Xaver Kitzinger, Atmosfair gGmbH 365_INQ-02057 _Monitoring and verification activities in countries with security issues  365_Response
8 June 2014 Mr. Gary Clyne, Trinidad Oilfield Services Limited 364_INQ-02002_Requesting for clarification (For the Carbon Market Pathway Plan) 364_Response
26 May 2014 Consejo de Pueblos de Tezulutlán 363_INQ-01928_Project 9713: Santa Rita Hydroelectric Plant. Request for registration should be rejected  363_Response
20 May 2014 Mr. Guillermo Font, Hidroeléctrica Santa Rita, S. A. 362_INQ-01907_Activity Project 9713: Comments to letter to the board sent by Consejo de Pueblos de Tezulutlán Manuel Tot  362_Response
5 May 2014 EKI Energy Services Limited 360_INQ-01856_Change in Project participants  360_Response
5 May 2014 EKI Energy Services Limited 359_INQ-01855_Communciations between PP and DOE 359_Response
24 April 2014 Mr. Fernando Freitas, Essencis Soluções Ambientais S.A. 356_INQ-01833_Registration fee and share of proceeds to cover administrative expenses (SOP-Admin) due for the issuance of CERs in the context of the current and forecasted market situation for the global carbon market (which faces very low levels of liquidity and price for CERs)  356_Response
24 April 2014 Mr. Xaver Kitzinger, Atmosfair gGmbH 355_INQ-01832_Monitoring and verification activities in countries with security issues  355_Response
8 April 2014 Mr. Ambachew F. Admassie, Ethan Bio-Fuels Pvt.  Ltd. Co 352_INQ-01787_Objection to CDM-PA7632-Rule01: the decision of the EB to reject request for registration Project 7632 v  
26 March 2014 Mr. Jimmy Sah, EKI Energy Services Limited 349_INQ-01734_Procedure for Revision of crediting period for registered projects  349_Response
24 March 2014 Sindicato Energético S.A. 348_INQ-01728_Effective Registration Date for CDM Project “Olmos 1 Hydroelectric Power Plant "(Ref. no. 7351)  348_Response
19 March 2014 Consejo de Pueblos de Tezulutlán Manuel Tot 347_INQ-01709_Project 9713: Santa Rita Hydroelectric Plant. Request for registration should be rejected.  347_Response
12 February 2014 Mr. Geoff Sinclair, Standard Bank Plc 346_INQ-01519_Post-registration changes of coordinating/managing entity for programme of activities  346_Response
23 January 2014 Mr. Philip M. Fearnside 342_INQ-01469_Request for report on hydroelectric dam emissions cited in EB15  342_Response
22 January 2014 Mr. Mayank Bindal 334_INQ-01407_Regarding project ref No. 9787  334_Response
16 January 2014 Mr. Xaver Kitzinger, Atmosfair gGmbH 340_INQ-01452_Change of start date of crediting period of specific CPA of a PoA 340_Response 
24 December 2013 Ms Ana Paula Beber Veiga, Ecopart Assessoria em Negócios Empresariais Ltda. 337_INQ-01415_Unplanned expansion of a CMD project activity whose crediting period has expired   337_Response
22 December 2013 Consejo de Pueblos de Tezulutlán Manuel Tot 335_INQ-01408-H7R4_Project 9713: Santa Rita Hydroelectric Plant. Request for registration should be rejected. 335_Response
13 December 2013  Mr. Ricardo Esparta, EQAO (Ecopart Assessoria em Negócios Empresariais Ltda) 333_INQ-01395-X7V2_Specific CPA (real case CPA-DD) implementation delay  333_Response
10 December 2013 Mr. Hector Francisco Rangel Legarreta, Biogas de Juarez S.A. de C.V. 332_INQ-01374-Y4Y4_Request for Support for Issuance of CERs for the CDM Project Activity 1123 Ciudad Juarez Gas to Energy Project  332_Response
21 November 2013  Mr. Samrat Sengupta 328_INQ-01344-M9Q7_Request for clarification on issuance of registered CDM project  328_Response
12 November 2013 Tae-Sang Ha, ECOEYE  327_INQ-01303-Y7F5_Post registration changes – Correction issues  327_Response
5 November 2013 Dr N Bhanumathidas, Eco Carbon Pvt. Ltd.

323_INQ-01254-R1J0_EB is not concerned about its decisions which are going at a tangent to its commitment of “improving the objectivity, clarity and broadening applicability, and/or ensuring environmental integrity of CDM rules (EB 62, Annex 15, clause 10 (b)).

323_INQ-01254-R1J0_Annex 1 (829 KB)

323_INQ-01254-R1J0_Annex 2 (668 KB)

 323_Response
24 October 2013 Wooam, Inc.

322_INQ-01253-L4Y4_Request for the Registration CDM by the project participant (98 KB)

 322_Response (6121 bytes)
 23 October 2013  Nuno Barbosa, Unicarbo - Energia e Biogás Ltda.

320_INQ-01231-G8Q1_Request of clarification about issues related to the renewal of crediting period of CDM project activities (424 KB)

 320_Response (386 KB)
23 October 2013 Ricardo Esparta, EQAO

319_INQ-01233-J4Q5_Renewal of crediting period and approval of changes (206 KB)

 319_Response (205 KB)
16 October 2013 Guonong, Beijing Rural Well-Off Economy & Technology Development
Center

318_INQ-01200-C4Q0_Request for special treatment of registration fees for rural household biogas CDMs (244 KB)

318_INQ-01200-C4Q0_Annex 1 and 2 (336 KB)

  318_Response (342 KB)

16 October 2013 Luca Morganti, First Climate (Switzerland) AG 317_INQ-01212-S7N4_Amendment of the registration date for Project Activity #6116 "Tanghe Tailong Cement WHR Project" (328 KB) (329 KB)  317_Response (194 KB)
 9 October 2013 N. Ramanathan, 
ECOENERGY Pvt. Ltd
314_Start date – 8th July 2008- Is Prior intimation required? (166 KB)  314_Reponse (544 KB)
9 October 2013
Thangamani pandian,
Vesta Renewable Energy private limited
313_Precise coordinates (128 KB)  313_Response (46 KB)
8 October 2013 Parineeta Dandekar, Damodar Pujari, SANDRP Organisation 312_Request for Review: Thangarabalu Small Hydel Project in Karnataka (290 KB)  312_Response (369 KB)
30 September 2013  Diego Nicoletti / Solví Participações S.A. 310_Request of reconsideration by the CDM-EB of registration dates for the recently registered CDM project activities with registration numbers 9295, 9298, 9300 and 9302 (641 KB)  310_Response (233 KB)
 27 September 2013  Ms. Tania Arosemena B, Centro de Incidencia Ambiental de Panamá (CIAM) 309_Project 7822: Bonyic Hydroelectric Project's request for registration should be rejected (325 KB)  309_Response (65 KB)
23 September 2013 Ms. Karen M. Nagai, Ecopart Assessoria em Negócios Empresariais Ltda. (EQAO) 303_Procedures for verifications/requests for issuance of PoA with the same DOE that has performed one of the CPAs inclusion (152 KB)  303_Response (488 KB)
10 September 2013 Eva Filzmoser, Carbon Market Watch  296_Tool promote sustainable development benefits. (595 KB)  296_Response (6726 bytes)
02 September 2013 Dr. N Bhanumathidas, Eco Carbon Pvt. Ltd. 295_Request for permission to resubmit our rejected project, India FaL-G Bricks & Block Project No. 04 with ref. No. 5348 for Registration (582 KB)  295_Response (75 KB)
03 September 2013 Helwan Cement Company S.A.E. 294_Effective Registration Date for CDM Project "Partial Fuel Switching to Agricultural Wastes, Sewage Sludge & Refuse Derived Fuel (RDF) at Helwan cement plant" (347 KB)   294_Respnse (42 KB)
03 September 2013 Suez Cement Company S.A.E. 293_Effective Registration Date for CDM Project "Partial Fuel Switching to Agricultural Wastes & Refuse Derived Fuel (RDF) at Kattameya cement plant" (347 KB)  293_Response (42 KB)
21 August 2013 Rachel Child, PD Forum 291_Withdrawal of LOAs (219 KB)   291_Response (27 KB)
20 August 2013 Parineeta Deshpande-Dandekar, South Asia Network on Dams, Rivers and People (SANDRP) 290_Request to Review 12.5 MW Nekkiladi Hydro Power Project (172 KB)   290_Response (49 KB)
20 August 2013 Parineeta Deshpande-Dandekar, South Asia Network on Dams, Rivers and People (SANDRP) 289_Request to Review 10 MW Manjanadka Hydro Project (601 KB)   289_Response (47 KB)
15 August 2013 Larry Philp, CO2 Spain 288_Registration Date Project 9255 (536 KB)  
13 August 2013 Alice Yang, Innovative Carbon Investment Co. Ltd. 287_Clarification on the PoAs registered under VVM track and the paragraph 20 of AMS-III.D (ver.19.0) (184 KB)  287_Response (70 KB)
7 August 2013 Parineeta Deshpande-Dandekar, South Asia Network on Dams, Rivers and People (SANDRP) 286_Request to Review Kukke I Hydel Project (5779 KB) 286_Response (918 KB)
6 August 2013 Yasuhiro Tamida, Marubeni Corporation 284_Deadline of notification of the intention to request a renewal of crediting period (167 KB) 284_Response (829 KB)
31 July 2013 Alfonso Lanseros, CO2 Solutions 282_Negative emissions reductions (191 KB) 280_Response (126 KB)
23 July 2013 Karen M. Nagai, Ecopart Assessoria em Negócios Empresariais Ltda. (EQAO) 280_Inclusion of more than one large scale component/project using the same measure in to one CPA (160 KB) 280_Response (542 KB)
18 July 2013 Theodoulos Mesmeris, DNA Cyprus 292_Status of Cyprus as an Annex I Party to the UNFCCC (959 KB) 292_Response (42 KB)
18 July 2013 Melissa Hirschheimer, Ecopart Assessoria em Negocios Empresariais Ltda 279_Stakeholder Editorial review of document safter I&RC incomplete, LT-Amazonas Project (9051) (4027 KB) 279_Response (596 KB)
11 July 2013 Timbaktu Collective, Society for Promotion of Wastelands Development 278_Local stakeholder consultation concerns regarding Nallakonda windfarm in Andhra Pradesh (177 KB) 278_Response (881 KB)
2 July 2013 Marcos Marcelo Mindlin, Central Térmica Loma de la Lata 276_Registration Date for Project 7178 Combined Cycle at Loma de la Lata Thermo Unit (242 KB) 276_Response (542 KB)
27 June 2013 Jaime Andrés García Urrea, Corporación para el Manejo Sostenible de los Bosques Masbosques 274_Request for registration INCOMPLETE: San Nicolas CDM (169 KB) 274_Response (641 KB)
20 June 2013 Mr. G.K. Chhanghani, Chhattisgarh Hydro Power LLP 271_Guidance on calculation of Beta in CAPM model (201 KB)  271_Response (6762 bytes)
17 June 2013 Ken Newcombe, C-Quest Capital Malaysia Limited 270_Stakeholder CDM PoA rule - Synchronized issuance request (193 KB) 270_Response (801 KB)
29 May 2013 Project Participant, Companhia Hidrelétrica Teles Pires 268_Teles Pires Hydropower Plant Project Activity (Ref. # 9301) (1744 KB) 268_Response (26 KB)
23 May 2013 Kleanthis Ellinas, K.P.E. C.D.M. Trading Ltd. 267_Request for lower registration fee or refund of part of the registration fee due to change of Kyoto Protocol status of Cyprus (167 KB)  267_Response (6882 bytes)
22 May 2013 Klaus Oppermann, The World Bank, Carbon Finance Unit 265_Determining "Project Participant" in the application of "Guidelines on assessment of debundling for SSC project activities" (Annex 13, EB 54) (221 KB) 265_Response (70 KB)
22 May 2013 Atul Sanghal, Emergent Ventures India Pvt. Ltd. 266_Not claiming carbon credits for a part of crediting period (229 KB) Outcome of EB73 (66 KB)
266_Response (1050 KB)
7 May 2013 Mukesh Chaudhary, Friends Group of Companies 258_Exceptional Permission for Validation of a Specific Project (172 KB) 258_Response (33 KB)
12 May 2013 Gareth Phillips, Project Developer Forum 260_Suggestions on policy issues: Discussion on the treatment of host country national mitigation policies (E- policies) under the CDM (112 KB) 260_Response (66 KB)
12 May 2013 N. Kalidas, Eco Carbon Pvt. Ltd. India 263_Request for personal hearing at Bonn or any other suitable place to represent the issue of non-applicability of debundling rules to bundles of small scale units owned individually and operated independently (975 KB) 263_Response (67 KB)
10 May 2013 Renato Ortega, Santo Antonio Energy S.A. 261_Santo Antonio Hydropower Project (Ref. 9282) (2054 KB) 261_Response (26 KB)
10 May 2013 Gareth Phillips, Project Developer Forum 259_Transparency in the CDM Process (71 KB) 259_Response (469 KB)
7 May 2013 Harish Sharma, EKI Energy Services Ltd. 258_Clarification request for Guidelines on the demonstration and assessment of prior consideration of the CDM (163 KB) 258_Response (787 KB)
3 May 2013 Nino Sergio Bottini, Green Domus Desenvolvimento Sustentável Ltda. 256_DOE ethical behaviour claim sent to Accreditation Panel and lack of transparency and action of the Accreditation Panel (2648 KB) 256_Response (1479 KB)
10 April 2013 Tania Lee, International Rivers 250_Request for the CDM Executive Board to review the Project 9038: Nam Ngum 5 (221 KB) 250_Response (880 KB)
2 April 2013 Mr. Vishnu Patnaik 249_Clarification on Debundling (166 KB) 249_Response (899 KB)
1 April 2013 K. Oppermann, World Bank 247_Clarification and rules for PoAs and CPAs (172 KB) 247_Response (912 KB)
28 March 2013 Dr N Bhanumathidas, Eco Carbon Pvt. Ltd. 248_Drawing dividing line between the definitions of 'Bundling' and 'Debundling Assessment' in order to avoid rejection of projects on technical misinterpretation (209 KB) 248_Response (440 KB)
19 March 2013 Jean Pierre Rennaud, Livelihoods Fund 243_Mangrove Restoration Program in Senegal (217 KB) 243_Response (64 KB)
12 March 2013 Rachel Child, Project Developer Forum 242_Crediting Period Renewal Procedure (2684 KB) 242_Response (125 KB)
11 March 2013 Ame Trandem, International Rivers 241_Request for the CDM Executive Board to review the Project 9017: Se San 4A Hydropower Project (Vietnam) (209 KB) 241_Response (854 KB)
27 February 2013 Gareth Phillips, Project Developer Forum 234_Acceleration of the issuance process (47 KB) 234_Response (128 KB)
19 February 2013 M.S.K.V.N. Rao 231_Need for review and change of procedures and timelines for CER issuance (240 KB) 231_Response (137 KB)
15 February 2013 Katy Yan and Ame Trandem, International Rivers 228_Request for the CDM Executive Board to review the Project 8761: Stung Tatay Hydroelectric Project (Cambodia) (422 KB) 228_Response (143 KB)
15 February 2013 Knut Vrålstad , Hidroelectrica La Higuera S.A. and Statkraft Norfund Power Invest AS 227_Letter of Concern: Suggestions on how to decrease the processing time and the CER delivery time (1264 KB) 227_Response (139 KB)
14 February 2013 João Sprovieri, Econergy Brasil Ltda. 226_Renewal of Crediting Period and Project plant configuration changes (161 KB) 226_Response (910 KB)
30 January 2013 Global Environment Institute (GEI) 224_Seeking Clarification from the Board in Treating Over-production of hydropower CDM Projects in ex-post due to change of "Effective Factor" as per Procedures for notifying and requesting approval of changes from the project activity as described in the registered PDD (218 KB) 224_Response (985 KB)
29 January 2013 Mariel Vilella, GAIA - Global Alliance for Incinerator Alternatives 222_"CEMEX Mexico: Biomass project at Huichapan cement plant" - Additionally issues (5166 KB) 222_Response (144 KB)
18 January 2013 Gareth Phillips, Project Developer Forum 219_Proposal to require actual case CPA-DD for every technology/measure included in the PoA DD (62 KB) 219_Response (879 KB)
16 January 2013 Rachel Child, Project Developer Forum 218_Proposal to waive registration fee (1721 KB) 218_Outcome of EB72 (66 KB)
15 January 2013 Jun Matsumoto, Marubeni Corporation, Global Environment Projects Dept. 216_Processing Request for Issuance (166 KB) 216_Response (792 KB)
15 January 2013 Yanan Liu, A&T; Carbon Asset Co., Limited 217_Query on the Completeness Check and Information and Reporting Check result for PoA project (210 KB) 217_Response (610 KB)
10 January 2013 Sara Eyckmans, Western Sahara Resource Watch 214_The UNFCCC Clean Development Mechanism and Western Sahara (281 KB) 214_Response (612 KB)
28 December 2012 Abhishek Kumar 211_Query Over De-bundling of Small Scale Project Activity (165 KB) 211_Response (866 KB)
19 December 2012 Rachel Child, Project Developer Forum 209_Equal handling of start notification for CPAs and project activities (202 KB) 209_Response (404 KB)
17 December 2012 Eva Filzmoser, Carbon Market Watch 206_Review of Additionality and Royalty procedures (181 KB) 206_Response (962 KB)
17 December 2012 Eva Filzmoser, Carbon Market Watch 207_Review of Additionality and Royalty procedures (171 KB) 207_Response (949 KB)
17 December 2012 Eva Filzmoser, Carbon Market Watch 208_Review of Additionality and Royalty procedures (228 KB) 208_Response (957 KB)
20 November 2012 Eva Filzmoser, Carbon Market Watch 199_Concerns about additionality of CDM Project 7096 Pamona 2 Hydroelectric Power Plant Project ( Indonesia) currently requesting registration (198 KB) 199_Response (755 KB)
16 November 2012 Sujatha Ramasamy, Emergent Ventures India (EVI) 197_Query on considering subsidy issued by government agencies for small scale renewable energy projects in establishing additionality (152 KB) 197_Response (756 KB)
11 November 2012 Rama Chandra Reddy, The World Bank Group, Carbon Finance Unit 193_Crediting period of a Programme of Activity (PoA) and a component project activity (CPA) (228 KB) 193_Response (764 KB)
11 November 2012 Rama Chandra Reddy, The World Bank Group, Carbon Finance Unit 194_Request for registration of projects and PoAs submitted during 2012 to be registered with date of registration in the first commitment period (243 KB) 194_Response (491 KB)
31 October 2012 Gareth Phillips, Project Developer Forum 188_Response to GAIA's report on landfill in the CDM (209 KB) 188_Response (397 KB)
28 October 2012 Ian Macdonald 186_Condonation of Time Deadline for Registration of a CDM Project (123 KB) 186_Response (466 KB)
24 October 2012 Klaus Oppermann, World Bank 180_Registration procedures (265 KB) 180_Response (919 KB)
23 October 2012 Anja Kollmuss, CDM Watch 185_CDM Ref. 4555, Shaanxi Wenjing Hydropower Project - Additionality Issues; (464 KB) 185_Response (464 KB)
22 October 2012 Farida Lowe, Project Developer Forum 179_PDF position on withdrawal and suspension of LoAs (62 KB) 179_Response (1062 KB)
18 October 2012 Sujatha Ramasamy, Emergent Ventures India 176_Query on Applicable Geographical Area in Common Practice Analysis (165 KB) 176_Response (833 KB)
17 October 2012 Otkur Ghojash, Pear Carbon Offset Initiative, Ltd 174_Possibility of Submitting a PoA for registration with multiple CPAs (207 KB) 174_Response (741 KB)
15 October 2012 Heloísa Garcia da Mota, Ecologica Institute 172_Use of the "Social Carbon Standard" for certifying CDM and PoAs (1932 KB) 172_Response (240 KB)
9 October 2012 Rachel Child, Project Developer Forum 171_Request for withdrawal of Guidelines on Common Practice v2 (EB69 Annex8) (2066 KB) 171_Response (891 KB)
9 October 2012 Sandeep Kota, Core CarbonX Solutions Pvt Ltd. 170_Queries on the Prior Consideration and Start Date (37 KB) 170_Response (531 KB)
4 October 2012 Papia Chakraborty, CTRAN Consulting Ltd. 169_Clarification regarding applicability of "Guidelines For Demonstrating Additionality Of Microscale Project Activities", Version 04 (34 KB) 169_Response (466 KB)
26 September 2012 Francisco Santo, Econergy Brasil Ltda 165_Landfill gas use for other purposes not defined in the registered Project Design Document (158 KB) 165_Response (514 KB)
26 September 2012 Jiwan Acharya, Asian Development Bank 166_Request for reconsideration of guidance proposed in EB 69 paragraph 93 (b) (164 KB) 166_Response (52 KB)
25 September 2012 Dr. Sven Kolmetz, PD Forum 164_Delays continuing to exceed the CMP mandated maximum and possible solutions (262 KB) 164_Response (472 KB)
19 September 2012 Mr. Jeff Swartz, IETA 163_Clarification to the annotated agenda of EB 69 on matters related to withdrawing or suspending letters of approval as per EB68 para 119 (772 KB) 163_Response (1048 KB)
31 August 2012 Christopher Brandt, The Climate Concept Foundation 157_Comment on CDM project proposal currently requesting registration (161 KB) 157_Response (33 KB)
24 August 2012 Rachel Child, Project Developer Forum 155_Grace period of documents used to assess additionality (2204 KB) 155_Response (516 KB)
24 August 2012 Gareth Phillips, Project Developer Forum 154_Urgent need to reduce the 'awaiting scheduling' timelines for registration and issuance requests (176 KB) 154_Response (881 KB)
23 August 2012 Falguni Joshi, Gujarat Forum on CDM 152_Suggestions to improve local stakeholder consultation (189 KB) 152_Response (451 KB)
21 August 2012 Mr. Klaus Oppermann, World Bank 151_Verification procedures for Small Scale Programme of Activities (126 KB) 151_Response (557 KB)
21 August 2012 Ms. Karen Nagai, EQAO 150_Request for issuance of CPAs in a registered PoA (158 KB) 150_Response (562 KB)
13 August 2012 Mr. Hun-Yang SOON, Eco-Ideal Consulting Sdn Bhd 148_Request for clarification on grid emission factor (216 KB) 148_Response (32 KB)
11 August 2012 Lai Shimao, Project Participant 195_Ask for returning the Sole Focal Point from the buyer back to project owner (CDM Project Activity 1862) (355 KB) 195_Response (578 KB)
Outcome of EB72 (68 KB)
11 August 2012 Lai Shimao, Project Participant 196_Ask for returning the Sole Focal Point from the buyer back to project owner (CDM Project Activity 2199) (354 KB) 196_Response (577 KB)
Outcome of EB72 (68 KB)
10 August 2012 Ms. Rachel Child, PD Forum 146_Application of revised GWP (50 KB) 146_Response (28 KB)
09 August 2012 Abhijit Banerjee, BOC India Ltd 147_Guidance on choice of approach for demonstrating Investment Barriers (77 KB) 147_Response (22 KB)
07 August 2012 Ms. Rachel Child, PD Forum 145_Options for improving communication and the accountability of the CDM (3361 KB) 145_Response (431 KB)
07 August 2012 Mr. Geoff Sinclair,Standard Bank Plc 144_Statistical sampling for POAs (186 KB) 144_Response (560 KB)
08 August 2012 Mr. Alfonso Lanseros, CO2 Solutions 143_Completeness check and Information and Reporting Check results (162 KB) 143_Response (41 KB)
08 August 2012 Mr. Alfonso Lanseros, CO2 Solutions 142_Registration date (161 KB) 142_Response (32 KB)
30 July 2012 Adriana Jacintho Berti, EQAO 140_Definition of the term 'country specific' of the Guidelines on additionality of first of its kind projects activities (174 KB) 140_Response (480 KB)
25 July 2012 Mr. Francisco Santo, Ecoenergy Brasil Ltd. 138_Deadline for registration of the projects in 2012. (197 KB) 138_Response (56 KB)
24 July 2012 Christopher Brandt, The Climate Concept Foundation 137_Comment on CDM project proposal currently requesting registration (period for requesting review ends 15th August 2012) (367 KB)
Annex 1 (96 KB)
137_Response (32 KB)
11 July 2012 Laurence W. Philp, Gestora de Programa Marco Palma, S.L. 133_Stakeholder CPA previously at validation as a CDM project (124 KB) 133_Response (41 KB)
05 July 2012 Mr. Gareth Phillips, PD Forum 131_Flaring tool guidance (76 KB) 131_Response (38 KB)
02 July 2012 Mr. Laurence W. Philp, Gestora de Programa Marco Palma, S.L. 128_Post-Registration Boundary Changes for PoAs (118 KB) 128_Response (950 KB)
01 July 2012 Mr. Gareth Phillips, PD Forum 127_Start date of CPAs (43 KB) 127_Response (31 KB)
21 June 2012 Ms. Cynthia Hendrayani, Navigat Organic Energy Indonesia, Pt 126_Clarification on the method of assignment of default value efficiency of a flare unit (160 KB) 126_Response (30 KB)
20 June 2012 Ms. Rachel Child, PD Forum 125_Post-registration changes (3624 KB) 125_Response (26 KB)
12 June 2012 Mr. Gareth Phillips, PD Forum 124_Response to call for input on schedule of CDM Roundtable meetings in 2012 (75 KB) 124_Response (39 KB)
29 May 2012 Mr. Ashok Kumar Agrawal, Hi-Tech Power & Steel Ltd. 116_Delay in project activity implementation by 2 years 11 months (58 KB) 116_Response (34 KB)
29 May 2012 Dr. Jürg Grütter, Grütter consulting and Latin American Development Bank (CAF) 117_Usage of the latest Approved Methodology Versions for Transport Projects Registered with a previous Methodology Version (69 KB) 117_Response (474 KB)
28 May 2012 Mr. Vivek Amin, Abellon Clean Energy Limited 114_Clarification on PoA CDM projects submission deadline (180 KB) 114_Response (579 KB)
25 May 2012 Mr. Rahul Kar, KPMG Services Pte Ltd 115_CPA Start date (164 KB) 115_Response (880 KB)
16 May 2012 Ms. Sara Eyckmans, Western Sahara Resource Watch 111_Western Sahara and the CDM-UNFCCC Foum el Oued Windfarm project (762 KB) 111_Response (29 KB)
3 May 2012 Mr. Daniel Martino, Carbosur 105_Change of location of registered project activity (100 KB) 105_Response (223 KB)
26 April 2012 Mr. Klaus Oppermann, World Bank Carbon Finance Unit 103_Implementation schedule for VVS track (901 KB) 103_Response (32 KB)
23 April 2012 Mr. Gareth Philips, PD Forum 102_Expansion of positive lists of additional technologies (46 KB) 102_Response (497 KB)
23 April 2012 Mr. Gareth Philips, PD Forum 100_Application of GWP (54 KB) 100_146_Response (28 KB)
23 April 2012 Mr. Gareth Philips, PD Forum 101_Issues of an editorial nature (74 KB) 101_Response (234 KB)
20 April 2012 Wim Vandenberghe / René Gonne, Dechert LLP 106_CDM project Activity 4722 (732 KB) 106_Response (744 KB)
18 April 2012 Ms. Anne Arquit Niederberger, Policy Solutions 099_Query on micro-scale CDM additionality guideline (157 KB) 099_Response (416 KB)
17 April 2012 Mr. Gareth Phillips 098_Choice of time for definition of MP (69 KB) 098_Response (28 KB)
17 April 2012 Ms. Rachel Child, PD Forum 096_Effective registration date/timeline for issuance (1041 KB) 096_Response (291 KB)
16 April 2012 Ms. Rachel Child, PD Forum 095_Removal of unnecessary requirements PCP paras 9 and 180: two-year subsequent notifications (1219 KB) 095_Response (1024 KB)
13 April 2012 Mr. Mahesh Kumar, Ecologikol Advisors India Private Limited 093_Investment analysis and Choice of Crediting period for (183 KB) 093_Response (388 KB)
10 April 2012 Mr. Niroj Mohanty, Core CarbonX Solutions Private Limited 092_Queries on start date (208 KB) 092_Response (320 KB)
10 April 2012 Mr. D. Satish, Ecofarm 091_Clarification on para 6 of Investment guidelines (105 KB) 091_Response (274 KB)
05 April 2012 Mr. Gareth Phillips, PD Forum 088_Common practice and FoiK as per additionality tool vers. 6 (47 KB) 088_Response (262 KB)
30 March 2012 Mr. Lalit Kumar Singhania, Indus Technical and Financial Consultants Ltd. 085_Use of Footnote 18 of ACM0012 Ver-04 where project activity is in commercial production on start of validation process (162 KB) 085_Response (35 KB)
29 March 2012 Ms. Karen M. Nagai, Eqao 090_Republication of PDD/PoA-DD/CPA-DD using the new form required under VVS Track (170 KB) 090_Response (433 KB)
28 March 2012 Ms. Adriana Berti, EQAO 089_Clarification request on the VVM (version 1.2) paragraphs 132 and 133 for projects with EIA under development (81 KB) 089_Response (417 KB)
08 March 2012 Mr. Gerald Hamaliuk, GenPower Carbon Solutions Limited;
Mensilin Holdings Sdn Bhd
084_Issues with Project 1214 Validation and first CER issuance (1101 KB) 084_Response (275 KB)
27 Feb 2012 Dr. Abdelmourhit Lahbabi, ADS Maroc 083_Clarification on procedures and on a validation issue for a CDM project activity in Morocco (46 KB) 083_Response (1189 KB)
26 Feb 2012 Ms. Rachel Child, Project Developer Forum 082_Prior consideration following EB60 - after EB response (919 KB) 082_Response (367 KB)
21 Feb 2012 Martin Stilkenbäumer,
Dr. Marten von Velsen-Zerweck, N. serve Environmental Services Gmbh
080_Recommendationon AM_REV_0227 (437 KB) 080_Response (472 KB)
20 Feb 2012 Gareth Philipps, PD Forum 077_Annotated agenda of the 66th meeting of the CDM's EB (130 KB) 077_Response (285 KB)
20 Feb 2012 Naoki Matsuo, Climate Experts 078_Clarification on Materiality Standard Decision (213 KB) 078_Response (468 KB)
19 Feb 2012 Mr. Samuel Shiroff, Bosch and Siemens Home Appliances Group 081_Decision making criteria and procedures related to small scale methodologies (335 KB) 081_Response (474 KB)
16 Feb 2012 Ms. Hyemi Park, Ecoeye 079_Inclusion of several projects in a CPA (104 KB) 079_Response (670 KB)
14 Feb 2012 Ms. Martha Djourdjin, Bridge Builders UG 075_Additionality of micro-scale and positive list CPAs under a large-scale PoA (201 KB) 075_Response (496 KB)
08 Feb 2012 Mr. MSKVN Rao,Individual / PDD developer 072_Request to consider the suggestion on arriving at FCj and FCn,v as first-hand data monitoring of the same are not published / not made available to the project activity developers in host country (India) or any host country which has similar situation. (473 KB) 072_Response (473 KB)
05 Feb 2012 Ms. Rachel Child, PD Forum 071_Clarification request on the Implementation Plan for the VVS, PCP and PS (1017 KB) 071_Response (419 KB)
02 Feb 2012 Ms. Eva Filzmoser, CDM Watch
Mr. Steve Herz, Sierra Club
070_Concerns on the additionality of CDM project activity 5027 (503 KB) 070_Response (291 KB)
02 Feb 2012 Mr. Samrat Sengupta, Consultant 068_Request for Clarification regarding utilization of the Annexure -1 of the CDM Project Standard (232 KB) 068_Response (308 KB)
18 Jan 2012 Christopher Brandt, Climate Concept Foundation 061_Concerns about a CDM project activity (168 KB) 061_Response (526 KB)
17 Jan 2012 K.C Dharma, Ecoeye Co. Ltd * Clarification for revision or re-registration of already registered CDM Project activity 060_Response (617 KB)
11 Jan 2012 Katy Yan, International Rivers on behalf of:
Frank Muramuzi, Executive Director, National Association of Professional Environmentalists
Tobias Schmitz, Team Leader, Both ENDS
Robert N. Kugonza, Coordinator, Africa Rivers Network
Lori Pottinger, Africa"
059_Concerns about registered project 4217 (232 KB) 059_Response (436 KB)
09 Jan 2012 CA.G.N.Jayaram,Chartered Accountant 058_Observations on CDM guidances to financial additionality (246 KB) 058_Response (630 KB)
28 Dec 2011 Hyemi Park, Ecoeye Co.,Ltd. Application of Multiple technologies on PoA (297 KB) Response (415 KB)
23 Dec 2011 Gareth Phillips, PD Forum Comment on conditional letters of approval (420 KB) Response (416 KB)
22 Dec 2011 N K Borthakur, Numaligarh Refinery Clarification regarding start date of crediting period for registered CDM project titled ‘NRL-Captive power generation by recovery and utilization of the waste energy (thermal and pressure) of HP steam’ (UNFCCC Ref No: 1644) (409 KB) Response (483 KB)
20 Dec 2011 Cynthia Hendrayani, KfW Clarification on delineation of Type II and Type III Projects and associated Methodologies (235 KB) Response (489 KB)
02 Dec 2011 Ms. Bruna Marigheto, EQUAO Clarification on First of its Kind projects (196 KB) Response (268 KB)
25 Nov 2011 Mr. Matthew Woods, Carbon Africa Ltd. Recommending changes to the draft revision of ACM0016 (1063 KB) Response (518 KB)
22 Nov 2011 Mr David Morrison, IFJ Korea Ltd. Voluntary proposal regarding HFC Decomposition Project in Ulsan (PA0003) (725 KB) Response (292 KB)
22 Nov 2011 Mr. Sandeep Kota, Core CarbonX Solutions Pvt Ltd . Queries on investment decission and prior consideration (216 KB) Response (268 KB)
04 Nov 2011 Daniel Blank, GFA Envest GmbH Comments on "Guidelines on common practice" (EB63, Annex 12) (224 KB) Response (482 KB)
04 Nov 2011 Anja Kollmuss, CDM Watch Request for discussion on how findings of SEI study will be incorporated into ACM0013 (215 KB)
Annex 1 (1458 KB)
Annex 2 (599 KB)
Response (385 KB)
02 Nov 2011 Eva Filzmoser, CDM Watch
Steve Herz, Sierra Club
Review of the Additionality of the CDM Project 4785: Guangdong Pinghai Power Plant, China (805 KB) Response (277 KB)
02 Nov 2011 Eva Filzmoser, CDM Watch
Katy Yann, International Rivers
Request for review of the Additionality of the CDM Project 3497: Sujiahekou Hydropower Station (958 KB)
Annex 1 (530 KB)
Response (321 KB)
28 Oct 2011 Hajime Watanabe, Mitsubishi UFJ Morgan Stanley Securities Co., Ltd Request for resubmission of a request for post-registration change in the start date of the crediting period (2148 KB) Response (291 KB)
25 Oct 2011 Dr N. Bhanumathidas, Eco Carbon Pvt. Ltd. Program of Activities- Clarification is sought regarding start date of program (573 KB) Response (227 KB)
13 Oct 2011 Mr. Wilson Pastor, Ministro de Recursos Naturales No Renovables Consideration of your request for review case PA 4722 (113 KB) Response (268 KB)
12 Oct 2011 Mr. Gareth Phillips , PD Forum Submission relating to the annotated agenda of the 63rd meeting of the CDM Executive Board / annex 9 (project standard) (91 KB) Response (274 KB)
12 Oct 2011 Mr. Gareth Phillips , PD Forum Unsolicited letter relating to the annotated agenda of the 63rd meeting of the CDM Executive Board / annex 10 (validation and verification standard) (118 KB) Response (305 KB)
10 Oct 2011 Mr. Gareth Phillips , PD Forum Recommending changes to Annex 11 Guidelines for First of its Kind technologies (74 KB) Response (333 KB)
09 Oct 2011 Mr. Gareth Phillips , PD Forum Recommending changes to Annex 12 Guidelines for Common Practice (224 KB) Response (477 KB)
07 Oct 2011 Mr. Gareth Phillips , Sindicatum Sustainable Resources Letter relating to additions/changes already proposed on the PS, VVS and PCP (219 KB) Response (437 KB)
05 Oct 2011 Mr. Tom Huxley, Climate Link Limited Communication on policy issues initiated by project participants- Clarification on First-of-its-kind guidance (203 KB) Response (421 KB)
27 Sep 2011 Mr. Gareth Phillips, PD Forum Comments on annexes 12 and 16 of the annotated agenda for EB63 (224 KB) Response (278 KB)
16 Sep 2011 Mr. Havard Norstebo, Green Development AS Request for simplification to the SSC-PoA (275 KB) Response (296 KB)
16 Sep 2011 Mr. Jung Young Geon, Natural Agricultural Cooperative Federation Request for clarification of a CDM regulation and its application (67 KB) Response (235 KB)
09 Sep 2011 Mr. Bhaskar Jyoti Nath, Emergent Ventures India Pvt. Ltd. Questions regarding Call for Public inputs on the use of the First-of-its-kind Barrier and the assessment of common practice (276 KB) Response (263 KB)
05 Sep 2011 Mr. Jon Gibbins,University of Edinburgh Comments on ACM0013 (481 KB) Response (400 KB)
31 Aug 2011 Ms. Rachel Child, PD Forum Info note on highest tariff in China (212 KB) Response (257 KB)
18 Aug 2011 L. K. Chandak, West Coast Paper Mills Ltd Advice request on verification of PA 1025 (208 KB) Response (243 KB)
15 Aug 2011 Mr. Leo Perkowski, PD Forum Delays in the publication of rejection reasons (36 KB) Response (429 KB)
05 Aug 2011 Mr. Steven Herz, Ms. Eva Filzmoser - Sierra Club, CDM Watch Summary of concerns about the additionality of Project Activity 4807 (380 KB) Response (294 KB)
04 Aug 2011 Ms. Anne-Sophie Zirah, Ably Carbon Clarification request on the definition of start date for a "restarted" CDM project (202 KB) Response (267 KB)

*Links for confidential submissions are de-activated