Post-registration change requests for prior approval – finalized

Prior approval requests pending publication | Published prior approval requests pending finalization | Search finalized prior approval and issuance track requests


Reference of post-registration change request PRC-
Project reference PA-
Process track Any
Prior approval
Issuance
Type of request Find requests with ANY ALL of the types:

Changes to the project design as described in the registered generic CPA-DD (CGCPA)
Temporary deviations from the monitoring plan or the monitoring methodology (TDEV)
Corrections that do not affect project design (CORR)
Permanent changes from the monitoring plan or the monitoring methodology (CGMPMETH)
Changes specific to A/R project activities (CGAR)
Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD (INCLMP)
Addition of specific case CPA DDs corresponding to generic CPA DDs (ADDCPA)
Changes to the project or programme design (CGPD)
Change to the start date of the crediting period (CGCP)

Final status

There are 1668 matching requests:

Displaying 1481-1500 of 1668

Reference Title Current state Last update
PRC-0801-001 Korea Water Resources Corporation (Kwater) small-scale hydroelectric power plants project II Approved
2017/10/19 10:19:45.075826 GMT+2
19 Oct 17
PRC-0788-001 Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project(The Samchonpo Thermal Power Plant and Younghung Thermal Power plant small scale hydroelectric power plants construction project) Approved
2013/01/25 12:50:42.775160 GMT+1
25 Jan 13
PRC-0784-001 Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power) Approved
2016/12/28 12:16:47.935373 GMT+1
28 Dec 16
PRC-0775-002 West Nile Electrification Project (WNEP) Approved
2019/09/26 10:47:32.176780 GMT+2
26 Sep 19
PRC-0775-001 West Nile Electrification Project (WNEP) Approved
2014/05/02 10:22:47.749706 GMT+2
02 May 14
PRC-0772-002 Waste Heat based 10 MW captive power project “GPIL- WHRB 2” CDM PROJECT ACTIVITY Approved
2015/03/03 11:42:58.633702 GMT+1
03 Mar 15
PRC-0772-001 Waste Heat based 10 MW captive power project “GPIL- WHRB 2” CDM PROJECT ACTIVITY Approved
2014/12/19 12:28:41.048476 GMT+1
19 Dec 14
PRC-0765-003 Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. Approved
2018/03/09 12:06:57.416312 GMT+1
09 Mar 18
PRC-0765-002 Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. Approved
2016/05/14 20:55:8.574679 GMT+2
14 May 16
PRC-0765-001 Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. Rejected
2014/12/11 12:51:46.668480 GMT+1
11 Dec 14
PRC-0763-002 Al-Shaheen Oil Field Gas Recovery and Utilization Project Approved
2021/04/20 08:45:31.550045 GMT+2
20 Apr 21
PRC-0763-001 Al-Shaheen Oil Field Gas Recovery and Utilization Project Approved
2021/04/16 08:49:46.826014 GMT+2
16 Apr 21
PRC-0751-002 Sanquhar and Delta Small Hydro Power Projects Approved
2023/04/25 09:14:21.590618 GMT+2
25 Apr 23
PRC-0751-001 Sanquhar and Delta Small Hydro Power Projects Approved
2023/04/06 08:37:49.010649 GMT+2
06 Apr 23
PRC-0735-001 La Vuelta and La Herradura Hydroelectric Project Approved
2014/05/20 12:44:17.073839 GMT+2
20 May 14
PRC-0708-001 Huaycoloro landfill gas capture and combustion Approved
2014/01/17 14:12:28.984730 GMT+1
17 Jan 14
PRC-0707-001 India-FaL-G Brick and Blocks Project No.1 Approved
2013/10/07 10:56:32.417789 GMT+2
07 Oct 13
PRC-0694-001 R K Powergen 20MW grid connected renewable energy biomass power project Approved
2013/09/27 15:33:2.146379 GMT+2
27 Sep 13
PRC-0679-001 Optimization of steam consumption at the evaporator Approved
2014/03/14 12:07:52.987809 GMT+1
14 Mar 14
PRC-0678-001 Nakoda WHR CDM Project Approved
2013/03/15 09:19:0.868427 GMT+1
15 Mar 13