22:43 02 Jan 26
Project:
0834 Egyptian Brick Factory GHG Reduction Project
- Request for post-registration changes
| Project | 0834 Egyptian Brick Factory GHG Reduction Project |
|---|---|
| PRC ref | PRC-0834-001 |
| Process track | Issuance |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 01 Mar 12 - 28 Feb 22 |
| Assessment opinion |
Assessment opinion (434 KB)
|
| Revised PDD |
Revised PDD (1264 KB)
Revised PDD - track changes (1268 KB)
|
| Supplementary documents |
Appendix 1 - 0834 1 CER Calculation.xls (86 KB)
Appendix 2 - 0834 1 CER Calculation tracked changes.xls (87 KB)
|
| Signed form |
Signed form (47 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 15 May 14 -
Approved
Effective approval date: 15 May 14
|
| Historic statuses |
16 Apr 14 -
Request published |

Assessment opinion
Appendix 1 - 0834 1 CER Calculation.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: