Project: 0784 Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power) - Request for post-registration changes
Project 0784 Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power)
PRC ref PRC-0784-001
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Feb 2013 - 09 Feb 2014
Assessment opinion Assessment opinion (368 KB)
Revised PDD  
Supplementary documents Appendix 1 - Attachment 1. Act on operation of electricity market.pdf (223 KB)
Appendix 2 - Attachment 2. Measures Act.pdf (1290 KB)
Signed form Signed form (455 KB)
DOE clarification
VVS version VVS 9.0
Current status 28 Dec 16 - Approved
Effective approval date: 28 Dec 16
Historic statuses 26 Nov 16 - Request published