20:56 25 Jan 25
Project:
0784 Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power)
- Request for post-registration changes
Project | 0784 Yangyang Renewable Energy Project (3MW Wind Power + 1.4MW Small Hydroelectric Power) |
---|---|
PRC ref | PRC-0784-001 |
Process track | Issuance |
DOE | DTSUS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion | Assessment opinion (368 KB) |
Revised PDD | |
Supplementary documents |
Appendix 1 - Attachment 1. Act on operation of electricity market.pdf (223 KB)
Appendix 2 - Attachment 2. Measures Act.pdf (1290 KB) |
Signed form | Signed form (455 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 28 Dec 16 -
Approved
Effective approval date: 28 Dec 16
|
Historic statuses |
26 Nov 16 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: