Project: 0801 Korea Water Resources Corporation (Kwater) small-scale hydroelectric power plants project II - Request for post-registration changes
Project 0801 Korea Water Resources Corporation (Kwater) small-scale hydroelectric power plants project II
PRC ref PRC-0801-001
Process track Issuance
DOE KFQ
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jun 08 - 31 May 15
Assessment opinion Assessment opinion (557 KB)
Revised PDD Revised PDD (1362 KB)   Revised PDD - track changes (1364 KB)
Supplementary documents
Signed form Signed form (772 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 19 Oct 17 - Approved
Effective approval date: 19 Oct 17
Historic statuses 20 Sep 17 - Request published