03:24 24 Nov 24
Project:
0822 Loma Los Colorados Landfill Gas Project
- Request for post-registration changes
Project | 0822 Loma Los Colorados Landfill Gas Project |
---|---|
PRC ref | PRC-0822-001 |
Process track | Prior approval |
DOE | GLC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 17 Mar 07 - 16 Mar 14 |
Assessment opinion | Assessment opinion (322 KB) |
Revised PDD | Revised PDD (1453 KB) Revised PDD - track changes (1920 KB) |
Supplementary documents |
Appendix 1 - Analisis Financiero PDD KDM_rev34-08aug2012.xlsm (1065 KB)
Appendix 2 - LLC Econ and sensitivity LFG capture power gen 28jun2012 (Revised).xls (54 KB) Appendix 3 - Loma Los Colorados LFG & CER estimation (Updated)_rev01_NB27032012.xls (78 KB) |
Signed form | Signed form (677 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 31 Oct 12 -
Approved
Effective approval date: 31 Oct 12
|
Historic statuses |
25 Sep 12 -
Published 25 Sep 12 - Summary note being prepared 10 Oct 12 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: