Project: 0788 Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project(The Samchonpo Thermal Power Plant and Younghung Thermal Power plant small scale hydroelectric power plants construction project) - Request for post-registration changes
Project 0788 Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project(The Samchonpo Thermal Power Plant and Younghung Thermal Power plant small scale hydroelectric power plants construction project)
PRC ref PRC-0788-001
Process track Issuance
DOE KSA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Nov 07 - 31 Oct 17
Assessment opinion Assessment opinion (547 KB)
Revised PDD Revised PDD (1110 KB)   Revised PDD - track changes (1113 KB)
Supplementary documents Appendix 1 - revised Investment Analysis.xls (26 KB)
Signed form Signed form (128 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Jan 13 - Approved
Effective approval date: 25 Jan 13
Historic statuses 27 Dec 12 - Request published