Project:
0788 Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project(The Samchonpo Thermal Power Plant and Younghung Thermal Power plant small scale hydroelectric power plants construction project)
- Request for post-registration changes
| Project | 0788 Korea South-East Power Co. (KOSEP) small scale hydroelectric power plants project(The Samchonpo Thermal Power Plant and Younghung Thermal Power plant small scale hydroelectric power plants construction project) |
|---|---|
| PRC ref | PRC-0788-001 |
| Process track | Issuance |
| DOE | KSA |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 01 Nov 07 - 31 Oct 17 |
| Assessment opinion |
Assessment opinion (547 KB)
|
| Revised PDD |
Revised PDD (1110 KB)
Revised PDD - track changes (1113 KB)
|
| Supplementary documents |
Appendix 1 - revised Investment Analysis.xls (26 KB)
|
| Signed form |
Signed form (128 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 25 Jan 13 -
Approved
Effective approval date: 25 Jan 13
|
| Historic statuses |
27 Dec 12 -
Request published |