Project: 0806 Demand side energy efficiency programmes for specific technologies at ITC Bhadrachalam pulp and paper making facility in India - Request for post-registration changes
Project 0806 Demand side energy efficiency programmes for specific technologies at ITC Bhadrachalam pulp and paper making facility in India
PRC ref PRC-0806-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Sep 2010 - 31 Dec 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jan 06 - 31 Dec 15
Assessment opinion Assessment opinion (219 KB)
Revised PDD Revised PDD (1003 KB)   Revised PDD - track changes (1013 KB)
Supplementary documents
Signed form Signed form (273 KB)
DOE clarification
Current status 02 Jul 14 - Approved
Effective approval date: 02 Jul 14
Historic statuses 03 Jun 14 - Request published