Post-registration change requests for prior approval – finalized

Prior approval requests pending publication | Published prior approval requests pending finalization | Search finalized prior approval and issuance track requests


Reference of post-registration change request PRC-
Project reference PA-
Process track Any
Prior approval
Issuance
Type of request Find requests with ANY ALL of the types:

Changes to the project design as described in the registered generic CPA-DD (CGCPA)
Temporary deviations from the monitoring plan or the monitoring methodology (TDEV)
Corrections that do not affect project design (CORR)
Permanent changes from the monitoring plan or the monitoring methodology (CGMPMETH)
Changes specific to A/R project activities (CGAR)
Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD (INCLMP)
Addition of specific case CPA DDs corresponding to generic CPA DDs (ADDCPA)
Changes to the project or programme design (CGPD)
Change to the start date of the crediting period (CGCP)

Final status

There are 1664 matching requests:

Displaying 781-800 of 1664

Reference Title Current state Last update
PRC-4492-001 Wastewater Treatment with Biogas System in Palm Oil Mill at Sikao, Trang, Thailand Approved
2013/09/03 11:27:50.620261 GMT+2
03 Sep 13
PRC-4491-002 Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand Approved
2013/07/05 10:56:33.606117 GMT+2
05 Jul 13
PRC-4491-001 Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand Approved
2013/03/06 10:35:15.300221 GMT+1
06 Mar 13
PRC-4480-001 Methane Recovery and Utilization at PT. Musim Mas Palm Oil Mill in Pangkalan Lesung, Riau Indonesia Approved
2013/03/15 16:18:31.705805 GMT+1
15 Mar 13
PRC-4479-001 Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand Approved
2013/03/15 16:14:15.845464 GMT+1
15 Mar 13
PRC-4475-001 9.9 MW Bundled Wind Power Project in Maharashtra by REI Agro Limited Approved
2013/08/02 12:31:14.504439 GMT+2
02 Aug 13
PRC-4466-001 Uganda Nile Basin Reforestation Project No.5 Approved
2020/10/22 09:20:56.257793 GMT+2
22 Oct 20
PRC-4463-003 Metro Delhi, India Approved
2023/05/19 07:37:49.238643 GMT+2
19 May 23
PRC-4463-002 Metro Delhi, India Approved
2017/02/28 12:05:48.370353 GMT+1
28 Feb 17
PRC-4463-001 Metro Delhi, India Rejected
2016/11/25 12:47:31.017097 GMT+1
25 Nov 16
PRC-4450-001 Grid connected renewable energy project in India Approved
2014/06/13 16:53:2.493341 GMT+2
13 Jun 14
PRC-4449-001 Monte Redondo Wind Farm Project Approved
2013/10/07 10:59:20.433172 GMT+2
07 Oct 13
PRC-4427-001 Yunnan Xinhe and Xingfu Expansion Hydropower Station Bundled Project Approved
2013/01/25 13:01:56.147500 GMT+1
25 Jan 13
PRC-4425-001 Hunan Shuangpai Wulipai 45MW Hydropower Project Approved
2016/04/07 11:47:39.237221 GMT+2
07 Apr 16
PRC-4408-001 Hunan Tongba Small Hydropower Project Approved
2017/07/06 14:50:13.003420 GMT+2
06 Jul 17
PRC-4394-001 Harapan Biogas Project Approved
2014/08/25 11:34:41.803465 GMT+2
25 Aug 14
PRC-4389-001 Xinjiang Lasite Hydropower Project of China Approved
2013/08/09 11:07:52.727817 GMT+2
09 Aug 13
PRC-4359-006 Mare Chicose Landfill Gas Project Approved
2022/10/13 09:33:35.175924 GMT+2
13 Oct 22
PRC-4359-005 Mare Chicose Landfill Gas Project Approved
2021/07/15 08:04:35.288965 GMT+2
15 Jul 21
PRC-4359-004 Mare Chicose Landfill Gas Project Approved
2019/11/15 15:01:47.150728 GMT+1
15 Nov 19