Project: 4568 Hydro electric power project by SJVNL in Himachal Pradesh - Request for post-registration changes
Project 4568 Hydro electric power project by SJVNL in Himachal Pradesh
PRC ref PRC-4568-001
Process track Prior approval
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Change to the start date of the crediting period
  • Proposed start date of crediting period: 13 May 2014
Applicable crediting period 13 May 14 - 12 May 24
Assessment opinion Assessment opinion (984 KB)
Revised PDD Revised PDD (1275 KB)   Revised PDD - track changes (1492 KB)
Supplementary documents
Signed form Signed form (1383 KB)
DOE clarification
VVS version VVS 7.0
Current status 30 Jun 15 - Approved
Effective approval date: 23 Jun 15
Historic statuses 28 Apr 15 - Published
12 May 15 - Awaiting DOE clarifications
26 May 15 - DOE clarifications received
26 May 15 - Summary note being prepared
02 Jun 15 - Awaiting EB decision