20:40 12 Nov 24
Project:
4550 Dak Pone Hydropower Project
- Request for post-registration changes
Project | 4550 Dak Pone Hydropower Project |
---|---|
PRC ref | PRC-4550-001 |
Process track | Issuance |
DOE | RINA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 02 Jun 18 - 01 Jun 25 |
Assessment opinion | Assessment opinion (755 KB) |
Revised PDD | Revised PDD (1642 KB) Revised PDD - track changes (1627 KB) |
Supplementary documents | |
Signed form | Signed form (625 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 01 Apr 20 -
Approved
Effective approval date: 01 Apr 20
|
Historic statuses |
03 Mar 20 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: