Project: 4589 Wastewater Treatment with Biogas System in Palm Oil Mill at Bangsawan, Surat Thani, Thailand - Request for post-registration changes
Project 4589 Wastewater Treatment with Biogas System in Palm Oil Mill at Bangsawan, Surat Thani, Thailand
PRC ref PRC-4589-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 23 Mar 2011 - 31 Dec 2012
Assessment opinion Assessment opinion (283 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (180 KB)
DOE clarification
VVS version VVS 2.0
Current status 11 Jul 13 - Approved
Effective approval date: 11 Jul 13
Historic statuses 12 Jun 13 - Request published