Project: 4585 India-FaL-G Brick and Blocks Project No.2. - Request for post-registration changes
Project 4585 India-FaL-G Brick and Blocks Project No.2.
PRC ref PRC-4585-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Aug 11 - 31 Jul 21
Assessment opinion Assessment opinion (592 KB)
Revised PDD Revised PDD (1183 KB)   Revised PDD - track changes (1237 KB)
Supplementary documents Appendix 1 - CDM VER1376 PDD-PRC VVS Track Registered PDD - ECPL 140125.pdf (1083 KB)
Appendix 2 - Upload Information for Documents.pdf (15 KB)
Signed form Signed form (58 KB)
DOE clarification
VVS version VVS 2.0
Current status 23 May 14 - Approved
Effective approval date: 23 May 14
Historic statuses 24 Apr 14 - Request published