Project: 4574 Wastewater Treatment with Biogas System in Palm Oil Mill at Sinpun, Surat Thani, Thailand - Request for post-registration changes
Project 4574 Wastewater Treatment with Biogas System in Palm Oil Mill at Sinpun, Surat Thani, Thailand
PRC ref PRC-4574-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 10 Aug 2011 - 31 Dec 2012

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 Aug 11 - 09 Aug 21
Assessment opinion Assessment opinion (167 KB)
Revised PDD Revised PDD (520 KB)   Revised PDD - track changes (508 KB)
Supplementary documents
Signed form Signed form (168 KB)
DOE clarification
VVS version VVS 2.0
Current status 26 Jun 13 - Approved
Effective approval date: 26 Jun 13
Historic statuses 28 May 13 - Request published