Finalized requests for deviation

In accordance with the current Procedures for requests for deviation a Designated Operation Entity may submit request for deviation regarding a project activity at the validation or verification stage.

Requests for deviation by DOEs and the responses provided by the Board are being made publicly available on this page, unless otherwise decided. The requests for deviations from the monitoring plan have the following code "I-DEV0XXX" and the deviations from an approved methodology have the following code "M-DEV0XXX".

If you are a DOE, please log in if you wish to submit a new request.


Reference of deviation request I/M-DEV
Type of request
Status
Concerned methodology
Reference of project (for requests at verification)

There are 327 matching requests:

Displaying 121-140 of 327

Reference Request for deviation Current Status Last update
I-DEV0338 Measurement of methane content of biogas Deviation accepted 23 Nov 10
I-DEV0337 Request for deviation for missing auxiliary electricity consumption meter for a period of 1 year Deviation accepted 19 Nov 10
I-DEV0336 Request for deviation for missing auxiliary electricity consumption meter for the period 4 June 2007 to 31 March 2008 Deviation accepted 19 Nov 10
M-DEV0335 Estimation of EGPJ_Add,y parameter in a capacity addition to an existent CDM Wind Power Plant Deviation accepted 18 Apr 11
I-DEV0334 Deviation for installation of meter at backup line with lower accuracy than that described in the monitoring plan of the registered PDD Deviation accepted 03 Nov 10
I-DEV0332 This deviation is related to the measurement procedures as described in the PDD of the amount of biomass consumed by the project. Deviation accepted 03 Nov 10
I-DEV0331 Deviations on the monitoring of volume of wastewater treated and project electricity consumption prior to installation of wastewater flow meter and kWh meter during the specified monitoring period Deviation accepted 05 Nov 10
I-DEV0329 Deviation from the registered Monitoring Plan regarding the electricity transported from a 110kV substation to a 35kV substation Deviation accepted 09 Feb 11
I-DEV0328 Calculation of the BOD5 for the dehydrated sludge disposed anaerobically Deviation accepted 28 Sep 10
I-DEV0327 Deviation from monitoring methodology regarding the use of DCS for the monitoring of Gross power generation from turbine & Auxiliary power consumption in power generation plant Deviation accepted 28 Sep 10
I-DEV0326 Deviation due to postponement of CMM monitoring system installation Deviation accepted 27 Oct 10
M-DEV0325 Deviation request to allow the use of the “Tool for the demonstration and assessment of additionality” to assess the additionality of a project activity, under methodology ACM0006 Deviation accepted 02 Sep 10
M-DEV0324 Deviation request to allow the use of the “Tool for the demonstration and assessment of additionality” to assess the additionality of a project activity, under methodology ACM0006 Deviation accepted 02 Sep 10
I-DEV0323 Deviation from the measurement methods and procedures as well as QA/QC procedures to be applied to the electricity supplied by the grid to the project activity from what was described in the registered PDD Deviation accepted 24 Sep 10
I-DEV0322 Deviation from the measurement methods and procedures as well as QA/QC procedures to be applied to the electricity supplied by the grid to the project activity from what was described in the registered PDD Deviation accepted 24 Sep 10
I-DEV0320 Measurement of methane content of biogas and flare efficiency Deviation accepted 24 Aug 10
I-DEV0319 Request for deviation for missing total biogas meter for a period of 2.5 months Deviation accepted 16 Sep 10
I-DEV0318 Calculation of BFi,y: Quantity of biomass combusted in the project plant based on measured data. Deviation not accepted 16 Aug 10
I-DEV0317 Deviation from registered PDD and monitoring methodolgy with regards to measurement of parameters to be monitored Deviation accepted 24 Aug 10
I-DEV0316 Deviation for installation of backup meter with lower accuracy than that described in the monitoring plan of the registered PDD Deviation accepted 23 Jun 10