Project: 1309 Jiangsu Qingshi Cement Plant's Low Temperature Waste Heat Power Generation Project - History
Project 1309: Jiangsu Qingshi Cement Plant's Low Temperature Waste Heat Power Generation Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB37
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE initial comments (1231 KB)
Revised Validation report with track changes (567 KB)
Annex 1a (1241 KB)
Annex 1b (266 KB)
Annex 2a (608 KB)
Annex 2b (620 KB)
Annex 2c (931 KB)
Annex 3a (196 KB)
Annex 4a (2057 KB)
Annex 4b (1460 KB)
Annex 4c (483 KB)
PP initial comments (123 KB)
Annex (607 KB)
Revised PDD (2197 KB)
Review Scope (91 KB)

EB meeting: EB42
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (647 KB)


PDD appendices
Appendix 1 - IRR Calculations (6MW) (155 KB)
Appendix 2 - IRR Calculations (7MW) (155 KB)
Appendix 3 - Financial Analysis with CDM income (39 KB)
Appendix 4 - Supporting evidence (to corrections) (11 MB)
Validation Report Validation report (3363 KB)

Data before acceptance of changes in PDD on 28 Apr 2010

CDM-PDD project design document (1239 KB)


PDD appendices
Appendix 1 - IRR Calculations (6MW) (155 KB)
Appendix 2 - IRR Calculations (7MW) (155 KB)
Appendix 3 - Appendix 3 - Financial Analysis with CDM income (43 KB)
Appendix 4 - Appendix 4 - Supporting evidence (to corrections) (11 MB)
Appendix 5 - Appendix 5 - NPV comparison (69 KB)
Appendix 6 - Appendix 6 - Further Evidences (2489 KB)