Project: 2039 Jiangxi Taojiang Hydropower Project - History
Project 2039: Jiangxi Taojiang Hydropower Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB45
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE Initial comments (160 KB)
Annex 1-1 The Certification of ICBC (54 KB)
Annex 1-2 Report on Operation Difficulties of GYEPI (355 KB)
Annex 1-3 Minutes of Board Meeting (November10, 2004) (98 KB)
Annex 1-4 Report on developing CDM (214 KB)
Annex 1-5 Adjustment Report for the Budget (409 KB)
Annex 1-6 Minutes of Board Meeting (March 08, 2005) (132 KB)
Annex 1-7 Notification of Commercial Bank of Ganzhou (91 KB)
Annex 1-8 CDM Consultant s (Coway s) LoI (77 KB)
Annex 1-9 CDM Consultation Contract (275 KB)
Annex 1-10 Fax for site investigation from consultant (307 KB)
Annex 1-11 Indicative Letter from Standard Bank (430 KB)
Annex 1-12 Standard Bank s LoI (736 KB)
Annex 1-13 ERPA between the PO and Standard Bank (116 KB)
Annex 1-14 Application Form to NDRC (237 KB)
Annex 2-1 Announcement of SL 16-95 Effectiveness (2006) (805 KB)
Annex 2-2 Applicability and the benchmark of SL 16-95 (143 KB)
Annex 2-3 Investmen Explanation on Engineering Construction (885 KB)
Annex 2-4 The revised IRR Calculation (276 KB)
Annex 2-5 Xinfeng Power Grid PPA (407 KB)
Annex 2-6 Xinfeng Tariff Approval by the DRC (266 KB)
Annex 2-7 Ganzhou Power Grid PPA (232 KB)
Annex 2-8 PDR and Revised PDR (722 KB)
Annex 2-9 Certificate of the Design Institute (330 KB)
Annex 2-10 Calculation of Internal Consumption (49 KB)
Annex 2-11 Calculation of Line Loss (37 KB)
Review Scope (92 KB)

EB meeting: EB46
(at which the report of the review team was/will be considered)

Data before corrections

Amount of Reductions 71,201 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (592 KB)


PDD appendices
Appendix 1 - IRR Spreadsheet (106 KB)
Validation Report Validation report (2606 KB)