02:25 03 Nov 25
Project:
2039 Jiangxi Taojiang Hydropower Project
- History
Data before corrections
| Amount of Reductions | 71,201 metric tonnes CO2 equivalent per annum |
|---|---|
| CDM-PDD |
project design document (592 KB)
PDD appendices Appendix 1 - IRR Spreadsheet (106 KB)
|
| Validation Report |
Validation report (2606 KB)
|

DOE Initial comments
Annex 2-4 The revised IRR Calculation
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: