Finalized requests for deviation

In accordance with the current Procedures for requests for deviation a Designated Operation Entity may submit request for deviation regarding a project activity at the validation or verification stage.

Requests for deviation by DOEs and the responses provided by the Board are being made publicly available on this page, unless otherwise decided. The requests for deviations from the monitoring plan have the following code "I-DEV0XXX" and the deviations from an approved methodology have the following code "M-DEV0XXX".

If you are a DOE, please log in if you wish to submit a new request.


Reference of deviation request I/M-DEV
Type of request
Status
Concerned methodology
Reference of project (for requests at verification)

There are 327 matching requests:

Displaying 21-40 of 327

Reference Request for deviation Current Status Last update
I-DEV0449 Application of calibration results to currect for lower accuracy readings from certain continuous flow meters. Deviation accepted 28 Dec 11
M-DEV0448 Determination of parameters post project start instead of prior start Deviation accepted 18 Apr 12
I-DEV0447 Request for deviation on the : (1) sampling process for the monitoring of the Chemical Oxygen Demand (COD) for untreated and treated wastewater against the monitoring plan, and (2) internal QA/QC requirement not met during the monitoring period. Deviation accepted 09 Dec 11
I-DEV0446 Deviation from the registered monitoring plan for parameter “Quantity of run-off water” (Qww,runoff) Deviation accepted 28 Nov 11
M-DEV0445 Deviation from methodology AM0009 (v.4) in order to cross check the volume of recovered gas processed by the project activity due to its interchangeability with an existing recovery facility. Deviation accepted 28 Feb 12
I-DEV0442 Use of alternative continuous flow meters (calibrated fiscal meters) at Tegal Gede metering station to replace broken flowmeter at production site, both metering systems located in the same pipeline. Deviation accepted 25 Nov 11
I-DEV0441 Deviation on the monitoring wastewater volume prior to installation of wastewater flow meter Deviation accepted 24 Nov 11
I-DEV0440 Deviation on the monitoring wastewater volume prior to installation of wastewater flow meter Deviation accepted 24 Nov 11
I-DEV0439 A.T.Biopower Rice Husk Power Project in Pichit, Thailand Deviation accepted 16 Nov 11
I-DEV0438 Deviation from the registered monitoring plan due to the change on the location of one of the monitoring meters Deviation accepted 14 Nov 11
I-DEV0437 Deviation from monitoring of the parameters, C_SF6,y and M_d,in Deviation accepted 27 Apr 12
I-DEV0436 Deviations in the LFG collection and utilization project activity adopting AM0011: Improper monitoring of LFG flow / lack of engine CH4 combustion efficiency and lack of flare operational conditions Deviation accepted 27 Jun 12
I-DEV0435 Conservative Monitoring plan deviation regarding accuracy of monitoring equipment Deviation accepted 27 Oct 11
I-DEV0434 Allowing alternative and conservative calculation of emission reduction from a CMM power plant Deviation accepted 17 Nov 11
I-DEV0433 Request for deviation on the monitoring of the wastewater volume (Qy,ww) Deviation accepted 19 Oct 11
I-DEV0432 Request for deviation on the monitoring of the Chemical Oxygen Demand (COD) for untreated and treated wastewater Deviation accepted 28 Nov 11
I-DEV0431 Deviation of the estimation of electricity consumed in the plant and the frequency of recording Deviation accepted 28 Dec 11
I-DEV0430 Deviation from Monitoring Plan for parameter volume of wastewater treated Deviation accepted 10 Oct 11
I-DEV0429 Deviation from the monitoring plan of the registered PDD: Change of monitoring frequency of parameters ‘heat rate’ and ‘combustion efficiency’ Deviation accepted 28 Dec 11
I-DEV0427 Deviation from Monitoring Plan for monitoring parameter ID25 and ID20/22b Deviation accepted 14 Nov 11