21:54 17 Jan 25
I-DEV0436: Deviations in the LFG collection and utilization project activity adopting AM0011: Improper monitoring of LFG flow / lack of engine CH4 combustion efficiency and lack of flare operational conditions
Reference | I-DEV0436 | |
---|---|---|
Submitted by | GLC (18 Apr 2012) | |
Project activity | 37: Rio Azul landfill gas and utilization project in Costa Rica | |
Selected monitoring period | 18 Aug 2004 - 30 Dec 2010 | |
Title/subject of deviation | Deviations in the LFG collection and utilization project activity adopting AM0011: Improper monitoring of LFG flow / lack of engine CH4 combustion efficiency and lack of flare operational conditions | |
Description |
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.
Please refer to the corresponding section (pages 2 to 21) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf" |
|
Assessment |
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.
Please refer to the corresponding section (pages 21 to 25) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf" |
|
Impact |
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.
Please refer to the corresponding section (page 25) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf" |
|
Annexes | Pictorial Chronology Rev 4 (2386 KB) | |
Rio_Azul_ER_calculations_15Feb2012.zip (43 MB) | ||
Req f Dev Rio Azul LFG_UNFCCC 0037_final (322 KB) | ||
Link to the documentation made available at validation stage or monitoring report | Link to relevant documentation | |
Signed form | Signed form (592 KB) | |
Decision |
This request for deviation has been accepted.
The Chairs have accepted the proposed request for deviation to the monitoring and reporting process for the first monitoring period, from 18 August 2004 to 30 December 2010. |
|
Current status | 27 Jun 2012 - Deviation accepted | |
Historic statuses |
01 Sep 2011 -
Submission received 29 Sep 2011 - Submission deemed incomplete 23 Dec 2011 - Resubmission received 17 Jan 2012 - Submission deemed incomplete 18 Apr 2012 - Resubmission received 16 May 2012 - Successfully passed the Completeness Check 12 Jun 2012 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: