13:45 25 Oct 25
I-DEV0436: Deviations in the LFG collection and utilization project activity adopting AM0011: Improper monitoring of LFG flow / lack of engine CH4 combustion efficiency and lack of flare operational conditions
| Reference | I-DEV0436 | |
|---|---|---|
| Submitted by | GLC (18 Apr 2012) | |
| Project activity | 37: Rio Azul landfill gas and utilization project in Costa Rica | |
| Selected monitoring period | 18 Aug 2004 - 30 Dec 2010 | |
| Title/subject of deviation | Deviations in the LFG collection and utilization project activity adopting AM0011: Improper monitoring of LFG flow / lack of engine CH4 combustion efficiency and lack of flare operational conditions | |
| Description |
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.
Please refer to the corresponding section (pages 2 to 21) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf" |
|
| Assessment |
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.
Please refer to the corresponding section (pages 21 to 25) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf" |
|
| Impact |
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.
Please refer to the corresponding section (page 25) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf" |
|
| Annexes |
Pictorial Chronology Rev 4 (2386 KB)
|
|
Rio_Azul_ER_calculations_15Feb2012.zip (43 MB)
|
||
Req f Dev Rio Azul LFG_UNFCCC 0037_final (322 KB)
|
||
| Link to the documentation made available at validation stage or monitoring report | Link to relevant documentation | |
| Signed form | Signed form (592 KB) |
|
| Decision |
The Chairs have accepted the proposed request for deviation to the monitoring and reporting process for the first monitoring period, from 18 August 2004 to 30 December 2010. |
|
| Current status | 27 Jun 2012 - Deviation accepted | |
| Historic statuses |
01 Sep 2011 -
Submission received 29 Sep 2011 - Submission deemed incomplete 23 Dec 2011 - Resubmission received 17 Jan 2012 - Submission deemed incomplete 18 Apr 2012 - Resubmission received 16 May 2012 - Successfully passed the Completeness Check 12 Jun 2012 - Awaiting EB decision |
|

Pictorial Chronology Rev 4
Rio_Azul_ER_calculations_15Feb2012.zip
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: