Project: 1659 13.5MW WHR Project in Hunan Niuli Cement Co., Ltd. - History
Project 1659: 13.5MW WHR Project in Hunan Niuli Cement Co., Ltd.
Request for review Request 1
Request 2
Request 3
Request 4


EB meeting: EB41
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE & PP - Initial comments (1507 KB)
Annex 1 - Present Status and Prospect on Pure Cold Heat Recovery Steam Generation in Gement Industry (286 KB)
Annex 2 - Cement low temperature waste heat power generation technology and current status (1031 KB)
Annex 3 - Analysis of the Waste Heat Utilization for Power generation in Dry Method Cement Production line (381 KB)
Annex 4 - Niuli-Xiangtan-20080708 (126 KB)
Annex 5 - Niuli-Changde-20080708 (126 KB)
Review Scope (94 KB)

EB meeting: EB42
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (424 KB)


PDD appendices
Appendix 1 - Enclosure 1 (103 KB)
Appendix 2 - Enclosure 2 (105 KB)
Validation Report Validation report (519 KB)