Project: 1169 GIPPL Waste Heat based 11.5 MW Captive Power Project - History
Project 1169: GIPPL Waste Heat based 11.5 MW Captive Power Project
Request for review Request 1
Request 2
Request 3


EB meeting: EB36
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE initial comments (33 KB)
Annex 1 - Revised Validation report (247 KB)
Bank Loan Document for Investment IRR Benchmark (412 KB)
Annex 2 - CERC order for Equity IRR Benchmark (572 KB)
Annex 3 - ERK data sheet with average waste gas flow (149 KB)
Annex 3 - ERK data sheet with minimum waste gas flow (154 KB)
Annex 3 - ERK data sheet with optimum waste gas flow (152 KB)
Annex 4 - Justification for PLF and Sensitivity (16 KB)
Annex 5 - Evidence for Baseline Scenario - Grid Electricity Bills (2417 KB)
Annex 5 - Evidence for Baseline Scenario - IRR sheetand levelised cost (170 KB)

Data before corrections

CDM-PDD project design document (540 KB)


PDD appendices
Appendix 1 - CER calculations (30 KB)
Appendix 2 - Financial analysis (167 KB)
Validation Report Validation report (251 KB)