Project:
1169 GIPPL Waste Heat based 11.5 MW Captive Power Project
- History
| Project | 1169: GIPPL Waste Heat based 11.5 MW Captive Power Project |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 EB meeting: EB36 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: DOE initial comments (33 KB)
Annex 1 - Revised Validation report (247 KB)
Bank Loan Document for Investment IRR Benchmark (412 KB)
Annex 2 - CERC order for Equity IRR Benchmark (572 KB)
Annex 3 - ERK data sheet with average waste gas flow (149 KB)
Annex 3 - ERK data sheet with minimum waste gas flow (154 KB)
Annex 3 - ERK data sheet with optimum waste gas flow (152 KB)
Annex 4 - Justification for PLF and Sensitivity (16 KB)
Annex 5 - Evidence for Baseline Scenario - Grid Electricity Bills (2417 KB)
Annex 5 - Evidence for Baseline Scenario - IRR sheetand levelised cost (170 KB)
|
Data before corrections
| CDM-PDD |
project design document (540 KB)
PDD appendices Appendix 1 - CER calculations (30 KB)
Appendix 2 - Financial analysis (167 KB)
|
|---|---|
| Validation Report |
Validation report (251 KB)
|

DOE initial comments
Annex 4 - Justification for PLF and Sensitivity