Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 223 | 224 | 225 | 226 | 227 | ... 669 >>
Displaying 4481-4500 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Parque Eólico Ventos de São Simão Casa dos Ventos Energias Renováveis Ltda. Brazil 30 Nov 2011
ACP Thermal Harvesting™ Project Vuselela Energy (Pty) Ltd. South Africa 30 Nov 2011
Taebaek Wind Park CDM Project Taebaek Wind Power Co., Ltd. Republic of Korea 30 Nov 2011
GHG abatement through wind power generation in Tamil Nadu, India Tamra Dhatu Udyog Private Limited India 30 Nov 2011
16 MW WHR Power Project by Shri Bajrang Power & Ispat Limited Shri Bajrang Power & Ispat Limited India 30 Nov 2011
25MW Solar PV Power Plant by Responsive SUTIP Limited Responsive SUTIP Limited India 30 Nov 2011
Sichuan Basigou 1st Level Hydropower Station Baoxing Basigou Hydropower Exploitation Co., Ltd China 30 Nov 2011
Wind Power Project in Shimoga District – Beta Wind Farm Private Limited Beta Wind Farm Private Limited India 30 Nov 2011
Fossil fuel replacement by biomass in the brick manufacturing Industry (Grupo 3) ALIENERGY S.A. Colombia 30 Nov 2011
Parque Eólico Ventos de Santa Rita Casa dos Ventos Energias Renováveis Ltda. Brazil 30 Nov 2011
El Guanillo wind farm phase II GAMESA ENERGÍA Dominican Republic 30 Nov 2011
Wind Energy Project in Karnataka by Beta Wind Farm Private Limited Beta Wind Farm Private Limited India 30 Nov 2011
Mulibettu Hydro Power Project Soham Phalguni Renewable Energy Pvt. Ltd. India 30 Nov 2011
Wind Energy Project Phase 2 at Tamil Nadu, India by FIL Fenner (India) Limited India 30 Nov 2011
Priyadarshini - Pertinent Wind Power Project in Maharashtra (M/s. Pertinent Infra and Energy Ltd.) M/s. Pertinent Infra and Energy Ltd. India 30 Nov 2011
Priyadarshini - Pertinent Wind Power Project in Maharashtra (M/s. Priyadarshini Polysacks Ltd.) M/s. Priyadarshini Polysacks Ltd. India 30 Nov 2011
Devaragaddi Hydro Power Project MSG Power Pvt. Ltd. India 30 Nov 2011
Waste Heat Recovery for Power Generation at Nova Cimangola New Cement Plant Nova Cimangola Angola 30 Nov 2011
Parque Eólico Ventos de São Pedro Casa dos Ventos Energias Renováveis Ltda. Brazil 30 Nov 2011
Parque Eólico Ventos de Santa Celina Casa dos Ventos Energias Renováveis Ltda. Brazil 30 Nov 2011