07:11 16 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
13361-13375
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Methane Recovery Project at Rimmer Palm Oil Mill in Sabah, Malaysia | Kuala Lumpur Kepong Berhad | Malaysia | 03 Sep 2008 |
Integrated Municipal Solid Waste processing complex at Kanpur in Uttar Pradesh, India | A2Z Infrastructure Private Limited | India | 02 Sep 2008 |
Yunnan Heyu Hydropower Project(Mahong River Cascade II) | Jinchong Hydropower Development Co.,ltd | China | 30 Aug 2008 |
Yunnan Liuhuangdong Hydropower Project (Mahong River Cascade III) | Jinchong Hydropower Development Co.,ltd | China | 30 Aug 2008 |
Installation of Waste Heat Recovery boilder in DG sets Tamil Nadu | Tamilnadu Petroproducts Limited | India | 19 Aug 2008 |
Insulation of Pyrosystem equipments from outside at Shree Cement Limited | Shree Cement Limited | India | 18 Aug 2008 |
Nagarjuna Hydro Energy Pvt. Ltd.’s hydel power project in Karnataka, India | Nagarjuna Hydro Energy Pvt Ltd | India | 08 Aug 2008 |
Landfill gas (LFG) collection and flaring system on La Duquesa landfill in Santo Domingo, Dominican Republic (geographic coordinates 18°33N 69°57 W) | Bionersis S.A. | Dominican Republic | 08 Aug 2008 |
Colombia | |||
Chile | |||
Brunei Darussalam Indonesia Cambodia Lao People's Democratic Republic Myanmar Malaysia Philippines Singapore Thailand Viet Nam |
|||
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: