Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 667 | 668 | 669
Displaying 13361-13375 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Methane Recovery Project at Rimmer Palm Oil Mill in Sabah, Malaysia Kuala Lumpur Kepong Berhad Malaysia 03 Sep 2008
Integrated Municipal Solid Waste processing complex at Kanpur in Uttar Pradesh, India A2Z Infrastructure Private Limited India 02 Sep 2008
Yunnan Heyu Hydropower Project(Mahong River Cascade II) Jinchong Hydropower Development Co.,ltd China 30 Aug 2008
Yunnan Liuhuangdong Hydropower Project (Mahong River Cascade III) Jinchong Hydropower Development Co.,ltd China 30 Aug 2008
Installation of Waste Heat Recovery boilder in DG sets Tamil Nadu Tamilnadu Petroproducts Limited India 19 Aug 2008
Insulation of Pyrosystem equipments from outside at Shree Cement Limited Shree Cement Limited India 18 Aug 2008
Nagarjuna Hydro Energy Pvt. Ltd.’s hydel power project in Karnataka, India Nagarjuna Hydro Energy Pvt Ltd India 08 Aug 2008
Landfill gas (LFG) collection and flaring system on La Duquesa landfill in Santo Domingo, Dominican Republic (geographic coordinates 18°33N 69°57 W) Bionersis S.A. Dominican Republic 08 Aug 2008
Colombia
Chile
Brunei Darussalam
Indonesia
Cambodia
Lao People's Democratic Republic
Myanmar
Malaysia
Philippines
Singapore
Thailand
Viet Nam