12:17 01 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
4441-4460
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Jbel Sendouq-Khalladi (Khalladi) wind farm project in Morocco | UPC Renewables SARL | Morocco | 04 Dec 2011 |
0.6 MW Wind Power Project by Alto Power & Energy (India) Pvt. Ltd. at Sangli district of Maharashtra, India | M/s Alto Power & Energy (India) Pvt. Ltd | India | 03 Dec 2011 |
Tertiary Catalytic Reduction of N2O at INVISTA's Nitric Acid Plant in Singapore | INVISTA (Singapore) Pte., Ltd | Singapore | 02 Dec 2011 |
Yiliang Baishuijiang Niulu Hydropower Project | Ruiyuan Hydropower Development Co., Ltd. | China | 02 Dec 2011 |
Bharat Resins Limited 0.6 MW Wind Power project 2011 | M/s. Bharat Resins Limited | India | 02 Dec 2011 |
Yiliang Baishuijiang Liuxi Hydropower Project | Ruiyuan Hydropower Development Co., Ltd. | China | 02 Dec 2011 |
NALCO 50.4 MW Wind Project 2011 Andhra Pradesh | M/s. National Aluminium Company Limited | India | 02 Dec 2011 |
Jiangxi Yuanshengyuan Chemical Co., Ltd. Alcohol Wastewater Methane Recovery and Power Generation Project | Jiangxi Yuanshengyuan Chemical Co., Ltd. | China | 02 Dec 2011 |
Guodian Tulufan Daheyan Wind Farm Phase I 49.5 MW Wind Power Project | Guodian Qingsong Tulufan New Energy Co., Ltd. | China | 02 Dec 2011 |
Yiliang Baishuijiang Wenjiao Hydropower Project | Ruiyuan Hydropower Development Co., Ltd. | China | 02 Dec 2011 |
Yiliang Baishuijiang Shangbaishui Hydropower Project | Ruiyuan Hydropower Development Co., Ltd. | China | 02 Dec 2011 |
Karan Biofuel Bioresidues briquettes supply for industrial steam/heat production in Kenya | Karan Biofuel Ltd | Kenya | 02 Dec 2011 |
Sichuan Baineng Biomass Cogeneration Project | Sichuan Baineng Biomass Power Generation Co., Ltd. | China | 02 Dec 2011 |
Zhejiang Nanyang 1st Cascade Hydropower Project | Qingyuan Nanyang 1st Cascade Hydropower Development Co., Ltd. | China | 01 Dec 2011 |
Zhejiang Jinghuikou Bundled Small Hydropower Project | Longyuan City Zhuxi Basin Hydropower Development Co., Ltd. | China | 01 Dec 2011 |
Zhejiang Xiushu Hydropower Project | Changshan County Furong Hydropower Co., Ltd. | China | 01 Dec 2011 |
Biomass based power project by Starlight Energy Limited at Nuapada, Odisha, India | Starlight Energy Limited | India | 01 Dec 2011 |
2 MW Solar PV Power Project in Madhya Pradesh | Adora Energy Private Limited | India | 01 Dec 2011 |
Installation of 18 solar projects (total of 109.8 MW) Nakhonratchasima, Loei, KhonKaen, Sakonnakhon, Nakhonphanom, Nongkhai and Udonthani Provinces, Thailand. | Solar Power company limited, Thailand | Thailand | 01 Dec 2011 |
Bundled Wind Power Project by EnKing International (EKIESL-CDM. November -11-01) | M/s. EKI Energy Services Ltd. | India | 01 Dec 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: