14:17 01 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
4461-4480
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Zhejiang Yanzhangxi 1st Cascade Hydropower Project | Longquan City Yanzhangxi Basin Hydropower Development Co., Ltd. | China | 01 Dec 2011 |
Guodian Shuozhou Haifeng Hutoushan phase II 49.5MW Wind farm project | Guodian Shuozhou Haifeng Wind Power Co., Ltd. | China | 01 Dec 2011 |
Soyo Combined Cycle Gas Cogeneration - CDM Project Angola | Angola Carbon, SA | Angola | 01 Dec 2011 |
CO2 Recovery Plant | Air Liquide | Peru | 01 Dec 2011 |
Guodian Shuozhou Haifeng Liujiayao 49.5MW Wind farm Project | Guodian Shuozhou Haifeng Wind Power Co., Ltd. | China | 01 Dec 2011 |
Gansu Yumen Sanshilijingzi North No.2 48 MW Wind Power Project | CNOOC New Energy Yumen Wind Power Co., Ltd | China | 01 Dec 2011 |
Zapoteca de Energia Wind Farm | Zapoteca de Energia S.A. de C.V. | Mexico | 01 Dec 2011 |
Zhejiang Yanzhangxi Bundled Small Hydropower Project | Longquan City Yanzhangxi Basin Hydropower Development Co., Ltd. | China | 01 Dec 2011 |
Jiaozuo Wen County Biogas Power Project | Jiaozuo City Yida Plant Oil Co., Ltd | China | 01 Dec 2011 |
Qingtongxia Aluminum Co., Ltd. 350kA Electrolytic Cells Upgrade & Retrofit Project | Qingtongxia Aluminum Co., Ltd. | China | 01 Dec 2011 |
Nestor Brick Kiln Energy Efficiency Project (Bundle I) | Nestor Consulting Limited | Bangladesh | 01 Dec 2011 |
1 MW Solar PV Power Project in Andhra Pradesh | Amrit Jal Ventures Ltd. | India | 01 Dec 2011 |
Waste Heat Recovery Project at Vizag | Continental Carbon India Ltd. | India | 01 Dec 2011 |
Tawau Geothermal Power Project | Tawau Green Energy Sdn. Bhd. | Malaysia | 01 Dec 2011 |
1 MW Solar PV power project in Rajasthan | Ganges Enterprises Private Limited | India | 01 Dec 2011 |
Fossil fuel replacement by biomass in the brick manufacturing Industry (Grupo 2) | ALIENERGY S.A. | Colombia | 30 Nov 2011 |
Fossil fuel replacement by biomass in the brick manufacturing Industry (Grupo 1) | ALIENERGY S.A. | Colombia | 30 Nov 2011 |
Parque Eólico Ventos de São Caetano | Casa dos Ventos Energias Renováveis Ltda. | Brazil | 30 Nov 2011 |
Parque Eólico Ventos de São Januário | Casa dos Ventos Energias Renováveis Ltda. | Brazil | 30 Nov 2011 |
Parque Eólico Ventos de Santa Aurélia | Casa dos Ventos Energias Renováveis Ltda. | Brazil | 30 Nov 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: