Project: 1737 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia - History
Project 1737: Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia
Request for review Request 1
Request 2
Request 3


EB meeting: EB42
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE/PP Initial comments (105 KB)
Baseline study of methane emission from anaerobic ponds (157 KB)
KLPOWER (511 KB)
PDD_KimLoong_Keningau_final_v6_track_changes (502 KB)
V5_4_Ch4_Bio_Treat (184 KB)
_ER Cal-AM0022_final4 (121 KB)
_FFB_power (26 KB)

Data before corrections

Amount of Reductions 38,915 metric tonnes CO2 equivalent per annum
CDM-PDD project design document (512 KB)


PDD appendices
Appendix 1 - Enclosure 1 (371 KB)
Appendix 2 - Enclosure 2 (119 KB)
Validation Report Validation report (1655 KB)

Data before approval of the request for post-registration changes on 15 Nov 2012

Link to PRC form PRC
CDM-PDD project design document (419 KB)


PDD appendices
Appendix 1 - Enclosure 1 (371 KB)
Appendix 2 - Enclosure 2 (119 KB)
Appendix 3 - Enclosure 3 (96 KB)
Appendix 4 - Enclosure 4 (2860 KB)