02:58 11 Jan 25
Project:
1737 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia
- History
Project | 1737: Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia |
---|---|
Request for review |
Request 1
Request 2 Request 3 EB meeting: EB42 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: DOE/PP Initial comments (105 KB) Baseline study of methane emission from anaerobic ponds (157 KB) KLPOWER (511 KB) PDD_KimLoong_Keningau_final_v6_track_changes (502 KB) V5_4_Ch4_Bio_Treat (184 KB) _ER Cal-AM0022_final4 (121 KB) _FFB_power (26 KB) |
Data before corrections
Amount of Reductions | 38,915 metric tonnes CO2 equivalent per annum |
---|---|
CDM-PDD |
project design document (512 KB)
PDD appendices Appendix 1 - Enclosure 1 (371 KB) Appendix 2 - Enclosure 2 (119 KB) |
Validation Report | Validation report (1655 KB) |
Data before approval of the request for post-registration changes on 15 Nov 2012
Link to PRC form | PRC |
---|---|
CDM-PDD |
project design document (419 KB)
PDD appendices Appendix 1 - Enclosure 1 (371 KB) Appendix 2 - Enclosure 2 (119 KB) Appendix 3 - Enclosure 3 (96 KB) Appendix 4 - Enclosure 4 (2860 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: