23:03 14 Nov 25
Project:
1737 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia
- History
| Project | 1737: Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 EB meeting: EB42 (at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team) Initial comments: DOE/PP Initial comments (105 KB)
Baseline study of methane emission from anaerobic ponds (157 KB)
KLPOWER (511 KB)
PDD_KimLoong_Keningau_final_v6_track_changes (502 KB)
V5_4_Ch4_Bio_Treat (184 KB)
_ER Cal-AM0022_final4 (121 KB)
_FFB_power (26 KB)
|
Data before corrections
| Amount of Reductions | 38,915 metric tonnes CO2 equivalent per annum |
|---|---|
| CDM-PDD |
project design document (512 KB)
PDD appendices Appendix 1 - Enclosure 1 (371 KB)
Appendix 2 - Enclosure 2 (119 KB)
|
| Validation Report |
Validation report (1655 KB)
|
Data before approval of the request for post-registration changes on 15 Nov 2012
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (419 KB)
PDD appendices Appendix 1 - Enclosure 1 (371 KB)
Appendix 2 - Enclosure 2 (119 KB)
Appendix 3 - Enclosure 3 (96 KB)
Appendix 4 - Enclosure 4 (2860 KB)
|

DOE/PP Initial comments
_ER Cal-AM0022_final4
Appendix 1 - Enclosure 1
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: