Project: 1737 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia - Request for post-registration changes
Project 1737 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia
PRC ref PRC-1737-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 10 Oct 10 - 09 Oct 20
Assessment opinion Assessment opinion (665 KB)
Revised PDD Revised PDD (852 KB)   Revised PDD - track changes (867 KB)
Supplementary documents
Signed form Signed form (51 KB)
DOE clarification DOE clarification 1 - 1737 Assessment Opinion_CLA.pdf (667 KB)
DOE clarification 2 - 1737 Revised PDD_CLA.pdf (735 KB)
DOE clarification 3 - 1737 Revised PDD_tracked changes_CLA.pdf (736 KB)
VVS version VVS 2.0
Current status 15 Nov 12 - Approved
Effective approval date: 15 Nov 12
Historic statuses 03 Oct 12 - Published
10 Oct 12 - Awaiting DOE clarifications
14 Oct 12 - DOE clarifications received
14 Oct 12 - Summary note being prepared
25 Oct 12 - Awaiting EB decision