Project: 1783 Methane capture from POME for electricity generation in Batu Pahat. - History
Project 1783: Methane capture from POME for electricity generation in Batu Pahat.
Request for review Request 1
Request 2
Request 3


EB meeting: EB42
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
DOE Initial comments (58 KB)
Annexure 1 - Assumptions used in Financial Analysis (61 KB)
Annexure 2 - Evidence for Interest Rate Alliance Bank (106 KB)
Annexure 3 - Evidence for Investment Cost (127 KB)
Annexure 4 - Evidence for Electricity Rate (606 KB)
Annexure 5 Sensitivity Analysis (374 KB)
Annexure 6 - Revised PDD version 03 (586 KB)
Annexure 7 - Revised Validation Report (283 KB)
Annexure 8 - Revised ER Calculation Sheet (84 KB)
Review Scope (88 KB)

EB meeting: EB43
(at which the report of the review team was/will be considered)

Data before corrections

CDM-PDD project design document (391 KB)


PDD appendices
Appendix 1 - CER Spreadsheet (91 KB)
Appendix 2 - Model (686 KB)
Validation Report Validation report (264 KB)