04:04 20 Nov 25
Project:
3179 Jincheng Chengzhuang 18 MW coal mine methane power generation project
- History
| Project | 3179: Jincheng Chengzhuang 18 MW coal mine methane power generation project |
|---|---|
| Request for review |
Request 1
Request 2 Request 3 |
Data before review
| CDM-PDD |
project design document (576 KB)
PDD appendices Appendix 1 - 3179_IRR (74 KB)
Appendix 2 - 3179_ER (30 KB)
|
|---|---|
| Validation Report |
Validation report (638 KB)
|
Data before approval of the request for post-registration changes on 18 Dec 2012
| Link to PRC form | PRC |
|---|---|
| CDM-PDD |
project design document (646 KB)
PDD appendices Appendix 1 - 3179_IRR (74 KB)
Appendix 2 - 3179_ER (30 KB)
|

project design document
Appendix 1 - 3179_IRR
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: