04:14 10 Jan 25
Project:
3179 Jincheng Chengzhuang 18 MW coal mine methane power generation project
- Request for post-registration changes
Project | 3179 Jincheng Chengzhuang 18 MW coal mine methane power generation project |
---|---|
PRC ref | PRC-3179-001 |
Process track | Prior approval |
DOE | ERM CVS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 02 Dec 10 - 01 Dec 20 |
Assessment opinion | Assessment opinion (185 KB) |
Revised PDD | Revised PDD (986 KB) Revised PDD - track changes (1019 KB) |
Supplementary documents | |
Signed form | Signed form (2373 KB) |
DOE clarification |
DOE clarification 6 - CCC_Jincheng_VO_Approval of Changes_13Nov2012_signed.pdf (189 KB) DOE clarification 7 - CCC_PRC Cla DOE response_13Nov2012signed.pdf (51 KB) |
VVS version | VVS 2.0 |
Current status | 18 Dec 12 -
Approved
Effective approval date: 18 Dec 12
|
Historic statuses |
17 Oct 12 -
Published 31 Oct 12 - Awaiting DOE clarifications 13 Nov 12 - DOE clarifications received 13 Nov 12 - Summary note being prepared 27 Nov 12 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: