Project:
3179 Jincheng Chengzhuang 18 MW coal mine methane power generation project
- Request for post-registration changes
| Project | 3179 Jincheng Chengzhuang 18 MW coal mine methane power generation project |
|---|---|
| PRC ref | PRC-3179-001 |
| Process track | Prior approval |
| DOE | ERM CVS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 02 Dec 10 - 01 Dec 20 |
| Assessment opinion |
Assessment opinion (185 KB)
|
| Revised PDD |
Revised PDD (986 KB)
Revised PDD - track changes (1019 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (2373 KB)
|
| DOE clarification |
DOE clarification 6 - CCC_Jincheng_VO_Approval of Changes_13Nov2012_signed.pdf (189 KB)
DOE clarification 7 - CCC_PRC Cla DOE response_13Nov2012signed.pdf (51 KB)
|
| VVS version | VVS 2.0 |
| Current status | 18 Dec 12 -
Approved
Effective approval date: 18 Dec 12
|
| Historic statuses |
17 Oct 12 -
Published 31 Oct 12 - Awaiting DOE clarifications 13 Nov 12 - DOE clarifications received 13 Nov 12 - Summary note being prepared 27 Nov 12 - Awaiting EB decision |

Assessment opinion