Reference of post-registration change request PRC-
Project reference PA-
Process track Any
Prior approval
Issuance
Type of request Find requests with ANY ALL of the types:

Changes to the project design as described in the registered generic CPA-DD (CGCPA)
Temporary deviations from the monitoring plan or the monitoring methodology (TDEV)
Corrections that do not affect project design (CORR)
Permanent changes from the monitoring plan or the monitoring methodology (CGMPMETH)
Changes specific to A/R project activities (CGAR)
Inclusion of a monitoring plan in the registered PDD, PoA-DD or CPA-DD (INCLMP)
Addition of specific case CPA DDs corresponding to generic CPA DDs (ADDCPA)
Changes to the project or programme design (CGPD)
Change to the start date of the crediting period (CGCP)

Final status

There are 1664 matching requests:

Displaying 1281-1300 of 1664

Reference Title Current state Last update
PRC-1835-001 Jradzor Small Hydroelectric CDM project Approved
2023/10/17 09:02:18.794805 GMT+2
17 Oct 23
PRC-1834-002 Xacbal Hydroelectric project Approved
2022/10/27 09:11:13.443554 GMT+2
27 Oct 22
PRC-1834-001 Xacbal Hydroelectric project Approved
2013/03/11 14:39:18.858597 GMT+1
11 Mar 13
PRC-1824-001 Wind power project by HZL in Karnataka. Approved
2021/04/06 09:10:56.116558 GMT+2
06 Apr 21
PRC-1795-001 Avoidance of methane production in POME treatment through Boustead Biotherm Palmass Technology Approved
2012/12/05 12:48:10.857921 GMT+1
05 Dec 12
PRC-1790-001 CEMEX Colombia: Biomass project at Caracolito cement plant. Approved
2013/03/12 12:04:8.821511 GMT+1
12 Mar 13
PRC-1787-004 Valdivia biomass power plant Approved
2017/01/05 10:31:54.971898 GMT+1
05 Jan 17
PRC-1787-003 Valdivia biomass power plant Approved
2016/03/17 10:36:58.895069 GMT+1
17 Mar 16
PRC-1787-002 Valdivia biomass power plant Approved
2014/06/20 10:09:25.196392 GMT+2
20 Jun 14
PRC-1787-001 Valdivia biomass power plant Approved
2013/05/16 11:59:46.347930 GMT+2
16 May 13
PRC-1778-001 15 MW Wind Energy Project in Maharashtra Approved
2022/08/10 08:53:48.730664 GMT+2
10 Aug 22
PRC-1774-001 Electricity generation from mustard crop residues: Tonk, India Approved
2020/07/24 08:37:40.671280 GMT+2
24 Jul 20
PRC-1770-001 Incauca S. A. Fuel Switch from Coal to Green Harvest Residues CDM Project Approved
2013/12/30 11:05:34.536807 GMT+1
30 Dec 13
PRC-1759-001 Shuangbai Ejia Magahe River Hydropower Project Approved
2013/03/14 11:28:24.607828 GMT+1
14 Mar 13
PRC-1745-001 Nanchang Maiyuan Landfill Gas Recovery and Utilisation Project Approved
2013/03/06 10:34:14.511133 GMT+1
06 Mar 13
PRC-1738-001 MY08-WWP-36, Methane Recovery in Wastewater Treatment, Pahang, Malaysia Approved
2013/03/06 10:23:37.071421 GMT+1
06 Mar 13
PRC-1737-002 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia Approved
2013/11/22 10:41:22.591039 GMT+1
22 Nov 13
PRC-1737-001 Methane Recovery for Onsite Utilisation Project at Desa Kim Loong Palm Oil Mill, Sook, Keningau, Sabah, Malaysia Approved
2012/11/15 12:17:15.591222 GMT+1
15 Nov 12
PRC-1727-001 Fossil Fuel switch over project activity at Ammonia-IV plant of GSFC Ltd, Vadodara, India. Approved
2013/01/03 13:02:38.231327 GMT+1
03 Jan 13
PRC-1719-003 WHR CDM CPP Approved
2015/02/13 11:42:24.509948 GMT+1
13 Feb 15