07:16 15 Nov 24
Project:
1896 Jincheng Sihe Coal Mine CMM Generation Project
- Request for post-registration changes
Project | 1896 Jincheng Sihe Coal Mine CMM Generation Project |
---|---|
PRC ref | PRC-1896-002 |
Process track | Issuance |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 22 Apr 09 - 21 Apr 19 |
Assessment opinion | Assessment opinion (529 KB) |
Revised PDD | Revised PDD (852 KB) Revised PDD - track changes (853 KB) |
Supplementary documents | |
Signed form | Signed form (53 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 02 Jun 16 -
Approved
Effective approval date: 02 Jun 16
|
Historic statuses |
04 May 16 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: