Project: 1865 Sinohydro Inner Mongolia Ximeng Honggeer Wind Power Project - Request for post-registration changes
Project 1865 Sinohydro Inner Mongolia Ximeng Honggeer Wind Power Project
PRC ref PRC-1865-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 25 Jan 09 - 24 Jan 16
Assessment opinion Assessment opinion (518 KB)
Revised PDD Revised PDD (324 KB)   Revised PDD - track changes (327 KB)
Supplementary documents
Signed form Signed form (112 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Mar 13 - Approved
Effective approval date: 20 Mar 13
Historic statuses 19 Feb 13 - Request published