Project: 1836 Poechos II hydroelectric plant project - Request for post-registration changes
Project 1836 Poechos II hydroelectric plant project
PRC ref PRC-1836-002
Process track Issuance
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 01 Apr 09 - 31 Mar 16
Assessment opinion Assessment opinion (253 KB)
Revised PDD Revised PDD (1528 KB)   Revised PDD - track changes (1509 KB)
Supplementary documents
Signed form Signed form (142 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 08 Jun 23 - Approved
Effective approval date: 08 Jun 23
Historic statuses 10 May 23 - Request published