09:55 12 Jul 25
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
10321-10340
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
0.8 MW Wind Power CDM Project by Dr. Santosh Prabhu, Rajasthan, India | Dr. Santosh Prabhu | India | 02 Mar 2010 |
Wind Power Plant UNIÃO DOS VENTOS 2 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant ARATUÁ 1 | Bioenergy | Brazil | 02 Mar 2010 |
0.8 MW Wind Power Project CDM project by Pravin Masalewale | Resurge Energy Private Limited | India | 02 Mar 2010 |
Wind Power Plant MIASSABA 2 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant REI DOS VENTOS 2 | Bioenergy | Brazil | 02 Mar 2010 |
Guangdong Shajiao "B" Power Plant Turbine Retrofit Project | ACT Global Environment Technology Co., Ltd. | China | 02 Mar 2010 |
CECIC Wuhan 2.2 MW Grid-connected Solar PV Power Generation Project | CECIC Wuhan Solar Energy Power Generation Co., Ltd | China | 02 Mar 2010 |
Renewable Energy Development project in North West Frontier Province (NWFP), Pakistan | Sarhad Hydropower Development Organization (SHYDO) | Pakistan | 02 Mar 2010 |
Wind Power Plant REI DOS VENTOS 4 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant UNIÃO DOS VENTOS 1 | Bioenergy | Brazil | 02 Mar 2010 |
Guangdong Longgaoshan Wind Power Project | China resources wind power Development Co., Ltd | China | 02 Mar 2010 |
Inner Mongolia Kezuohouqi Baiyintala wind power project | Longyuan (Kezuohouqi) Wind Power Co., Ltd. | China | 02 Mar 2010 |
3MW Wind Power Project of Tidewater Oil in Tamil Nadu, India | Tide Water Oil Co (I) Ltd | India | 02 Mar 2010 |
Steam generation with tail gas CDM project at Oxiteno Camaçari - Bahia | Oxiteno Nordeste S.A. Indústria e Comércio | Brazil | 01 Mar 2010 |
Chennai Citi Centre Holdings private Ltd - 4.5 MW Wind Power Project, Tirunelveli | Chennai Citi Centre Holdings Private Ltd | India | 01 Mar 2010 |
Coal to Biomass Fuel Switch for Heat Generation Project at PT First International | PT First International Gloves | Indonesia | 01 Mar 2010 |
Inner Mongolia Wengniute Xiyangshugou Wind Power Project | Longyuan (Wengniute) New Energy Co., Ltd | China | 01 Mar 2010 |
Wuxi Xidong Municipal Waste Incineration Project | Wuxi XiDong Environment & Energy Corporation | China | 01 Mar 2010 |
Henan Xinyu 100,000t Biodiesel Project | Henan Xinyu Biology Technology Co., Ltd | China | 01 Mar 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: