21:27 15 Jul 25
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
10301-10320
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Reduction in Greenhouse Gas emissions through replacement of Fuel Oil with Natural Gas in refinery furnace operations at Essar Oil Ltd. | Essar Oil Limited | India | 04 Mar 2010 |
Reduction in Greenhouse Gas emissions through switching from higher carbon intensive feedstock to Natural Gas in Hydrogen Manufacturing Unit at Essar Oil Ltd. | Essar Oil Limited | India | 04 Mar 2010 |
Electricity generation using renewable wind energy by Sahyadri Industries Limited | Sahyadri Industries Limited | India | 04 Mar 2010 |
Reduction in Greenhouse Gas emissions through recovery and utilization of surplus Low Pressure steam in VAM units for refrigeration function at different satellite buildings and process building units at Essar Oil Ltd | Essar Oil Limited | India | 04 Mar 2010 |
Flare Gas recovery project in Essar Oil Ltd. | Essar Oil Ltd. | India | 04 Mar 2010 |
Bundled Wind Power generation project by Savita Oil Technologies Ltd., India | Savita Oil Technologies Ltd. | India | 04 Mar 2010 |
Boniyar small hydro project of VRB Hydro Power Pvt. Ltd. Jammu & Kashmir, India | VRB Hydro Power Pvt. Ltd. | India | 04 Mar 2010 |
Steam and power savings due to better steam trap management at Essar Oil Ltd., Vadinar | Essar Oil Limited | India | 04 Mar 2010 |
Energy efficiency improvement project through modification of heat exchanger network at Essar Oil Ltd. | Essar Oil Limited | India | 04 Mar 2010 |
Biomass based fuel switch project at Reckitt Benckiser (India) Limited | Reckitt Benckiser (India) Ltd | India | 03 Mar 2010 |
METALDOM Fuel Switch in furnaces | COMPLEJO METALURGICO DOMINICANO, C. POR A. (METALDOM) | Dominican Republic | 03 Mar 2010 |
Inner Mongolia Chifeng Dayuying Wind Farm Project | Guodian Technology & Environment Group Chifeng Wind Power Co., Ltd. | China | 03 Mar 2010 |
Wind Power Plant MIASSABA 3 | Bioenergy | Brazil | 02 Mar 2010 |
CEMEX Mexico Low Carbon Cement | CEMEX Mexico S.A. de C.V. | Mexico | 02 Mar 2010 |
Wind Power Plant REI DOS VENTOS 3 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant ARATUÁ 2 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant ARATUÁ 3 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant MIASSABA 4 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant REI DOS VENTOS 1 | Bioenergy | Brazil | 02 Mar 2010 |
Wind Power Plant UNIÃO DOS VENTOS 3 | Bioenergy | Brazil | 02 Mar 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: