Displaying
10281-10300
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Waste Heat Recovery and its utilization by Varrsana Ispat Limited | Varrsana Ispat Limited | India | 08 Mar 2010 |
200 MW Wind Farm At The Gulf of EL ZAYT | New and Renewable Energy Authority (NREA) | Egypt | 07 Mar 2010 |
Wind Power Project in Maharashtra | G.I. Energies | India | 06 Mar 2010 |
Santa Rosa POM Waste to Energy Project | Santa Rosa S.A. | Guatemala | 06 Mar 2010 |
Huaneng Gansu Guazhou Ganhekou No.2 200MW Wind farm project | Carbon Resource Management S.A. | China | 05 Mar 2010 |
Baner Sangam small hydro power project | Yogindera Powers Limited | India | 05 Mar 2010 |
Tunjita Diversion Hydroelectric Project | AES CHIVOR & CIA SCA ESP | Colombia | 05 Mar 2010 |
YongHwa Energy power plant CDM project | EcoNetwork Co., Ltd. | Republic of Korea | 05 Mar 2010 |
Lentec PV power plant CDM project | EcoNetwork Co., Ltd. | Republic of Korea | 05 Mar 2010 |
Manufacturing of Slag Cement in the states of Andhra Pradesh and Karnataka by JSW Cement Limited | JSW Cement Limited | India | 05 Mar 2010 |
K-water small-scale hydroelectric power plants VII bundle CDM project | Korea Water Resources Corporation | Republic of Korea | 05 Mar 2010 |
Rural electrification project for clean energy, better living and sustainable growth in Bhutan | Bhutan Power Corporation Limited | Bhutan | 05 Mar 2010 |
Nongkensanjiang 12MW Biomass Cogeneration Project | Heilongjiang Jiansanjiang Nongkensanjiang Thermal Power Co., Ltd. | China | 04 Mar 2010 |
Lautaro generation project | COMASA S.A. | Chile | 04 Mar 2010 |
Fuel switch from fuel oil (FO) to natural gas (NG) in existing 77 MW power plant at Essar Oil Ltd. | Essar Oil Limited | India | 04 Mar 2010 |
24 MW Gullu Hydro Electric Project | M/s Chhattisgarh Hydro Power Project Pvt. Ltd. | India | 04 Mar 2010 |
Kamna Wind Power Project | M/s. Kamna Industries Private Limited | India | 04 Mar 2010 |
SIL-WTG4200-MM | Sumilon Industries Ltd. | India | 04 Mar 2010 |
Reduction in steam consumption through change of vacuum creation technology in the Diesel Hydro De-sulphurisation Unit (DHDS) unit at Essar Oil Ltd | Essar Oil Limited | India | 04 Mar 2010 |
Installation of a new natural gas based 220 MW power plant at Essar Oil Ltd. | Essar Oil Limited | India | 04 Mar 2010 |
Offset now: visit the United Nations Carbon Offset Platform