19:22 15 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8721-8740
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Wind Power Project by RSGBL | Riddhi Siddhi Gluco Biols Limited | India | 28 Aug 2010 |
Xinjiang Kashi River Taledesayi Hydropower Project | Guodian Xinjiang Jilintai Hydropower Development Co., Ltd. | China | 27 Aug 2010 |
Grid Connected Bundled Wind Power Project in Jaisalmer, Rajasthan, India | Diamonds ‘R’ Us | India | 27 Aug 2010 |
Hubei Macheng Rural Solar Cooker Utilization Project | Shanghai Techase Environment Protection Technology Co., LTD | China | 27 Aug 2010 |
Gansu Dunhuang Energy saving modification Project from surplus heat utilization of sodium sulfide furnace of Xiyu mining chemical industry | Xiyu mining chemical industry Co., LTD in Dunhuang City, Gansu Province | China | 27 Aug 2010 |
Inner Mongolia Linxi Dashuiboluo Wind Farm Phase I Project | Linxi Aolujia New Energy Development Co., Ltd. | China | 27 Aug 2010 |
Mindanao Grains Bundled Biomass-Fired Corn Dryers in Two (2) Post Harvest Facilities in Bukidnon, Philippines | Mindanao Grain Processing Co. Inc. | Philippines | 27 Aug 2010 |
40 MW Sugarcane Bagasse Cogeneration Project - UTE Baia Formosa | CPFL Bioformosa | Brazil | 27 Aug 2010 |
3 MW Wind Power CDM Project by Shajahans Jewellers, Nagercoil, Tamil Nadu, India | Shajahans Jewellers | India | 27 Aug 2010 |
2.5 Mw power generation through installation of wind turbine generators in Tamil Nadu, India | M/s Fort Projects Pvt Ltd | India | 27 Aug 2010 |
Ningxia Taiyangshan Wind Farm Jingneng First Phase 49.5 MW Project | Ningxia Jingneng New Energy Co., Ltd. | China | 27 Aug 2010 |
Xinjiang Kashi River Salikete Hydropower Project | Guodian Xinjiang Jilintai Hydropower Development Co., Ltd. | China | 27 Aug 2010 |
Huaneng Laizhou Phase II Wind Farm Project | Huaneng Shandong Power Generation Co., Ltd. | China | 27 Aug 2010 |
Xinjiang Kashi River Nileke First Stage Hydropower Project | Guodian Xinjiang Jilintai Hydropower Development Co., Ltd. | China | 27 Aug 2010 |
Rice husk based energy generation in Haryana by REI Agro Ltd. | REI Agro Ltd. | India | 26 Aug 2010 |
Distribution of Improved cook stove – Phase II | G K Energy Marketers Pvt Ltd | India | 26 Aug 2010 |
Distribution of Improved cook stove – Phase I | G K Energy Marketers Pvt Ltd | India | 26 Aug 2010 |
Greenhous Gas Emission Reductions Through Natural Gas - Samalkot Power Ltd. | Samalkot Power Ltd. | India | 26 Aug 2010 |
Biomass based captive cogeneration generation project by Punjab Riceland Pvt. Ltd. | Punjab Rice Land Pvt. Ltd. | India | 26 Aug 2010 |
Biomass based steam generation project by Tau Agro Sales Pvt. Ltd. | Tau Agro Sales Pvt. Ltd. | India | 26 Aug 2010 |