17:19 15 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8681-8700
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Small Hydro Power Project in Temghar, Maharashtra | Suvas Holdings Limited | India | 03 Sep 2010 |
PANNA 1 N2O Abatement Project | EcoSecurities International Limited | Chile | 03 Sep 2010 |
Tulehu 2 x 10 MW Geothermal Power Project | PT PLN (Persero) | Indonesia | 03 Sep 2010 |
Xidahe Hydropower Project in Gansu Province | Gansu Dayu Xidahe Hydro Power Development Co., Ltd. | China | 03 Sep 2010 |
Small Hydro Power Project in Yedgaon, Maharashtra | Laxmi Organic Industries Limited. | India | 03 Sep 2010 |
GuoDian Ningxia Dawoukou Phase I Solar Photovoltaic Power Project | Ningxia Guodian A'tesi New Energy Development Co., Ltd. | China | 03 Sep 2010 |
GuoDian Ningxia Pingluo Phase II Solar Photovoltaic Power Project | Ningxia Guodian A'tesi New Energy Development Co., Ltd. | China | 03 Sep 2010 |
Omnia New Nitric Acid Steam Turbine | Omnia | South Africa | 03 Sep 2010 |
Peusangan I and II Hydro Power Project | PT PLN (Persero) | Indonesia | 03 Sep 2010 |
Biomass-fired Corn Dryer in a Post-Harvest Facility (PHF) in Mindanao Grains, Reina Mercedes, Isabela, Philippines | Mindanao Grain Processing Inc. | Philippines | 03 Sep 2010 |
Manta Hydroelectric Power Plant | Peruana de Inversiones en Energías Renovables S. A. C. | Peru | 03 Sep 2010 |
Electric Furnace Waste Heat Power Generation Project of Yunnan Wenshan Dounan Manganese Industry | Yunnan Wenshan Dounan Manganese Industry | China | 02 Sep 2010 |
Anning River Canyon Wind Farm (Phase I) Project in Dechang County Sichuan Province | Dechang Wind Power Development Co., Ltd. | China | 02 Sep 2010 |
3.3 MW Wind power project at Theni by FFF-Site SF158 & SF317 | Foods Fats & Fertilizers Ltd. | India | 02 Sep 2010 |
Electric Furnace Low Temperature Waste Heat Power Generation Project of Yunnan Jianshui Manganese Mine Co., Ltd. 2 | Yunnan Jianshui Manganese Mine Co., Ltd. | China | 02 Sep 2010 |
4.5 MW Wind Power CDM Project by M/s Texmo Industries, Coimbatore, India | Texmo Industries | India | 01 Sep 2010 |
ML Technologies-Solar power plant project. | ML Technologies | Benin | 01 Sep 2010 |
Da Krong 1 Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 01 Sep 2010 |
2.1 MW Wind power project of Madanlal Paliwal | Madan Lal Paliwal | India | 01 Sep 2010 |
Qirehata‘er 195 MW Hydropower Project Xinjiang Province, China | Xinhua Kashgar Qirehata'er Hydropower Development Co., Ltd. | China | 01 Sep 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: