11:16 15 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8561-8580
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Akhfennir Wind Farm Project - Morocco. | NAREVA Holding | Morocco | 16 Sep 2010 |
Haouma Wind Farm Project - Morocco. | NAREVA Holding | Morocco | 16 Sep 2010 |
Community-based Reforestation on Degraded Lands in East Lombok | Forestry Research and Development Agency | Indonesia | 16 Sep 2010 |
Thac Xang Hydro-power project | CARBONIUM | Viet Nam | 16 Sep 2010 |
Kangbao Zhaoyanghe Wind Farm Project | Guodian Tianwei Kangbao Wind Power Co. Ltd. | China | 16 Sep 2010 |
Inner Mongolia Sansheng 49.5 MW Wind Farm Project Phase I | Xining Aiyuan Landfill Gas Co., Ltd. | China | 16 Sep 2010 |
Foum El Oued Wind Farm Project - Morocco. | NAREVA Holding | Morocco | 16 Sep 2010 |
Jilin Taonan Xinli 49.5 MW Wind Power Project | Jilin Tong Li Wind Farm Power Co., Ltd. | China | 16 Sep 2010 |
Agro fuels based Boiler for Power Generation at Salem Steel Plant | Steel Authority of India Limited, India | India | 15 Sep 2010 |
1.25 MW biomass gasification based power generation at Bhopal District of Madhya Pradesh by Anant Urja Private Limited | Anant Urja Private Limited | India | 15 Sep 2010 |
Regenerative Burners for Melting Furnaces | Dubai Aluminum Company LTD (DUBAL) | United Arab Emirates | 15 Sep 2010 |
ROHIT SURFACTANTS PVT.LTD- 10.5 MW Wind Project, Tamil Nadu | M/s. Rohit Surfactants Pvt. Limited | India | 15 Sep 2010 |
6 MW biomass based cogeneration plant at Virudhunagar District of Tamil Nadu by Sripathi Paper and Boards Private Limited | Sripathi Paper and Boards Private Limited | India | 15 Sep 2010 |
Energy efficient shaft kilns at new Refractory Material Plant #3 of Bhilai Steel Plant | Steel of Authority of India Limited, India | India | 15 Sep 2010 |
Dingbian Zhangjiashan Wind Farm Phase I Project | Datang Shaanxi Power Generation Co., Ltd., P.R.C. | China | 15 Sep 2010 |
Samsung Electronics Development of PFCs Emission Abatement Facility in the Semiconductor Process | Samsung Electronics Co., Ltd. | Republic of Korea | 15 Sep 2010 |
Biogas Power Generation Project in Longganhu Town, Huanggang city, Hubei Province, P.R. China | Hubei Huadian Longganhu Biogas Power Generation co., Ltd | China | 15 Sep 2010 |
Caetité 2 Wind Power Plant CDM Project Activity. | Neoenergia S.A. | Brazil | 14 Sep 2010 |
0.8 MW Wind Power CDM Project of Mr. Rahul Dravid, Rajasthan | Mr. Rahul Dravid | India | 14 Sep 2010 |
Caetité 1 Wind Power Plant CDM Project Activity. | Neoenergia S.A. | Brazil | 14 Sep 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: