09:11 15 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8541-8560
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Cochea Hydroelectric Plant | Generadora Alto Valle, S.A. | Panama | 20 Sep 2010 |
Mode-Shift of passengers from Private vehicles to MRTS for Delhi Metro Phase III | Delhi Metro Rail Corporation Ltd. | India | 20 Sep 2010 |
"Blast Furnace Waste Gas based Power Project by M/s. SLR Metaliks Limited" | SLR Metaliks Ltd. | India | 20 Sep 2010 |
Shanghai Jinshan Municipal Solid Waste Incineration for Power Generation Project | Shanghai Jinshan Biomax Green Energy Co., Ltd. | China | 19 Sep 2010 |
Shanxi Shuocheng Limin First Phase Wind Power Project | DaTang New Energy Shuozhou Windpower Co.Ltd. | China | 19 Sep 2010 |
Biomass Gasification system at Trang province, Thailand | Plan Ecoenergy Co., Ltd. | Thailand | 18 Sep 2010 |
8.4 MW (0.6 MW X 14 Nos) Wind Power Project by Sri Padmabalaji Steels Pvt Ltd, Coimbatore, Tamil Nadu, India | M/s Sri Padmabalaji Steels Pvt Ltd | India | 18 Sep 2010 |
"9 MW Wind Electricity Generation Project" by KRBL Ltd., at Karnataka, India | KRBL LIMITED | India | 18 Sep 2010 |
Heilongjiang Xingkaihu (Fengmishan) Wind Farm Project | Carbon Resource Management S.A. | China | 17 Sep 2010 |
Biogas CHP Project in Suzhou Wanshen Flour Products Plant | Asja Renewables (Shenyang) Co., Ltd. | China | 17 Sep 2010 |
Waste Heat Recovery Project by Ultra Tech Cement Limited (Unit -Aditya Cement Works) | Ultra Tech Cement Limited | India | 17 Sep 2010 |
Waste Heat Recovery Project by Ultra Tech Cement Limited 1 | Ultra Tech Cement Limited | India | 17 Sep 2010 |
Waste Heat Recovery Project by Ultra Tech Cement Limited 4 | Ultra Tech Cement Limited | India | 17 Sep 2010 |
Waste Heat Recovery Project by Ultra Tech Cement Limited 2 | Ultra Tech Cement Limited | India | 17 Sep 2010 |
Waste Heat Recovery Project by Ultra Tech Cement Limited 3 | Ultra Tech Cement Limited | India | 17 Sep 2010 |
Laogang Renewable Energy Utilization Centre | Shanghai Laogang Solid Waste Utilization Co., Ltd. | China | 17 Sep 2010 |
Waste Heat Recovery Project by Ultra Tech Cement Limited 5 | Ultra tech Cement Limited | India | 17 Sep 2010 |
Lanzhou Bus Rapid Transit (BRT) Project | Lanzhou Public Traffic Group | China | 17 Sep 2010 |
Heilongjiang Mishanlinchang (Liumao) Wind Farm Project | Carbon Resource Management S.A. | China | 17 Sep 2010 |
Naresuan Hydropower Project | Electricity Generating Authority of Thailand (EGAT) | Thailand | 16 Sep 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: