23:14 14 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8341-8360
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Intergrated Municipal Solid waste management Project in Dwaraka Pappankalan, Delhi | Delhi MSW solutions Ltd (Wholly Owned Subsidiary of REEL) | India | 14 Oct 2010 |
Co-Composting Project in Simpang Damar Village, Kubu Subdistrict, Bangko, Rokan Hilir Regency | Swiss Carbon Assets Ltd. | Indonesia | 14 Oct 2010 |
Integrated Municipal Solid Waste management facility in Koyambedu, Chennai | M/s. Ramky Enviro Engineers Ltd. | India | 14 Oct 2010 |
1 MW Grid Connected Solar Power Plant at Sirsa, India. | M/s. Sukhbir Solar Energy Private Limited | India | 14 Oct 2010 |
Inner Mongolia Datang International Hongmu Phase II Wind Farm Project | Inner Mongolia Datang International Zhouzi Wind Power Generation Co., Ltd. | China | 14 Oct 2010 |
Indwe Wind Project | DNA Wind Farm (Pty) Limited | South Africa | 14 Oct 2010 |
An Phuoc Hydropower Project | INTRACO Co., Ltd. | Viet Nam | 14 Oct 2010 |
50 TPD Municipal Solid waste management Facility, Haldia, India | West Bengal Waste Management Ltd (Wholly Owned Subsidiary of REEL) | India | 14 Oct 2010 |
Usage of Blast Furnace gas in 6 MW Captive Power Plant and in Reheating Furnace | Kalyani Gerdau Steels Limited | India | 14 Oct 2010 |
Beijing Lingshan Wind Farm Project Phase 1 | Beijing Jingneng Clean Energy Co., Ltd. | China | 13 Oct 2010 |
Beijing Badaling Solar PV Power Pilot Project | Beijing Jingneng Clean Energy Co., Ltd. | China | 13 Oct 2010 |
Enlightening Kids | Solkar Solar Industry Limited | India | 13 Oct 2010 |
Aksu Tianshan Duolang Cement Co., Ltd. Kashi Branch Cement Plant Waste Heat | Aksu Tianshan Duolang Cement Co., Ltd. | China | 13 Oct 2010 |
Grid Connected Wind Power Project | M/s. Siporex India Pvt. Ltd. | India | 13 Oct 2010 |
Xinjiang Tianshan Cement Co., Ltd. Tarim Branch Cement Plant Waste Heat Recovery | Xinjiang Tianshan Cement Co., Ltd. | China | 13 Oct 2010 |
Coke Oven Gas Utilized to Provide Heat for the Magnesium Production Project | Xinjiang Metal Magnesium Manufacture Co., Ltd. | China | 13 Oct 2010 |
Natural Gas Based Trigeneration Project by Alliance Filaments Ltd., Surat | Alliance Filaments Ltd. | India | 12 Oct 2010 |
Inner Mongolia China Water Group Huade Heping Wind Farm 49.5 MW Project | China Water Group Huade Wind Power Co., Ltd. | China | 12 Oct 2010 |
Lumut Balai Unit 1,2,3,4 Geothermal Project | PT Pertamina Geothermal Energy (PT PGE) | Indonesia | 12 Oct 2010 |
Natural Gas Based Cogeneration Project by Salasar Polytex Pvt. Ltd., Surat | Salasar Polytex Pvt. Ltd. | India | 12 Oct 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: