21:22 14 Sep 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
8301-8320
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Installation of 6 solar projects (total of 31.25 MW) Suphanburi and Nakhnopatom Provinces, Thailand | Yanhee Solar Power Company Limited | Thailand | 20 Oct 2010 |
Energy Efficiency Improvement in a District Cooling and Cogeneration Project | DISTRICT COOLING SYSTEM AND POWER PLANT COMPANY LIMITED (DCAP) | Thailand | 20 Oct 2010 |
Konkola Copper Mine Water Pumping Energy Efficiency Project | Konkola Copper Mines plc | Zambia | 20 Oct 2010 |
19.5 MW Wind Power Project of NuPower Renewables Limited | NuPower Renewables Limited | India | 19 Oct 2010 |
Wind Power Project in Tirunelveli Tamilnadu | Vish Wind Infrastructure LLP | India | 19 Oct 2010 |
Alto Alegre energy efficiency project | Usina Alto Alegre S/A – Açúcar, Álcool e Energia | Brazil | 19 Oct 2010 |
Dak Mi 3 Hydropower Project, Vietnam | ecotawa AG | Viet Nam | 19 Oct 2010 |
1.65 MW Wind Power Project By G. R. Engineering Pvt. Ltd. | G R Engineering Pvt. Ltd. | India | 19 Oct 2010 |
Dakdrinh Hydropower Project | Energy and Environment Consultancy Joint Stock Company | Viet Nam | 19 Oct 2010 |
Longonot Phase I Geothermal Power Plant | Renewable Ventures Limited (representing AGIL) | Kenya | 19 Oct 2010 |
Longonot Phase 1 Geothermal Power Plant | Renewable Ventures Limited (representing AGIL) | Kenya | 19 Oct 2010 |
Datang Tuquan Laoyeling Phase I Wind Farm Project | Datang Hebei Power Generation Co., Ltd. | China | 18 Oct 2010 |
Inner Mongolia Wuliji Phase II Wind Power Project | Datang Wulate Houqi Wind Power Co., Ltd. | China | 18 Oct 2010 |
4.95 MW Bundled Wind Power Project in Theni, Tamilnadu, India | Sagar Power Limited | India | 18 Oct 2010 |
12.5 MW Multifuel based Cogeneration project by Satia Industries Limited (SIL) | Satia Industries Limited | India | 18 Oct 2010 |
Furnace Fuel Oil to Natural Gas Conversion | INCA | Dominican Republic | 18 Oct 2010 |
Inner Mongolia Chifeng Changhangou Wind Power Project | DaTang Wengniuteqi New Energy Co., Ltd. | China | 18 Oct 2010 |
Putian Houhai Wind Power Project | Fumei Houhai (Putian) Wind Power Co., Ltd. | China | 18 Oct 2010 |
1.5 MW Wind Project by Western India Sea Brines Pvt. Ltd. | Western India Sea Brines Pvt. Ltd. | India | 18 Oct 2010 |
Small Scale Renewable Power Generation Project in India by Ecolutions Carbon India Pvt. Ltd. | M/s Bharat Timber & Construction Co. | India | 18 Oct 2010 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: