Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 354 | 355 | 356 | 357 | 358 | ... 669 >>
Displaying 7101-7120 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Fumeng Gulibengao Wind Farm Project Fuxin Taihe Wind Power Co., Ltd. China 07 Mar 2011
52.50 MW Wind energy farm at Mokal Rajasthan by HZL Hindustan Zinc Limited India 07 Mar 2011
Fumeng Maniuhu Wind Farm Project Fuxin Taihe Wind Power Co., Ltd. China 07 Mar 2011
15 MW Wind energy farm at Gopalpura, Karnataka by HZL Hindustan Zinc Limited India 07 Mar 2011
Huaneng Dalian Wafangdian Zhaotun Wind Farm Project Huaneng (Wafangdian) Wind Power Generation Co., Ltd. China 07 Mar 2011
Green Energy Project at Kutch by Powerica Limited Powerica Limited India 07 Mar 2011
Integrated biomass power project at Perundurai, Erode district, Tamil Nadu, India Perundurai Green Energy Pvt. Ltd. India 07 Mar 2011
HEPP Urumuka 6 PT. Papua Power Indonesia Indonesia 07 Mar 2011
Ca Loi hydropower project CARBONIUM Viet Nam 07 Mar 2011
Waste to Energy project of Ginez Farm Ginez Farm Corporation Philippines 05 Mar 2011
A Plus Hog Farm Waste to Energy Project A Plus Hog Farm Inc. Philippines 05 Mar 2011
1.50 MW Wind Power CDM Project by M/s. SVE Castings Private Limited, Bellary - Karnataka, India. M/s. SVE Castings Private Limited, Bellary. India 05 Mar 2011
Energy efficiency measures at Barauni Refinery, IOCL Indian Oil Corporation Limited, Barauni Refinery India 05 Mar 2011
Yanting Biomass Power Generation Project Greenstone Carbon Asset Management CO.,LTD China 04 Mar 2011
10MW Solar Photovoltaic Power Plant in Rajkot, Gujarat (India) Green Infra Solar Energy Limited India 04 Mar 2011
Liaoning Faku Woniushi Wind Power Project Longyuan Shenyang Wind Power Co., Ltd. China 04 Mar 2011
Yunnan Luliang Damogu Wind Power Project Yunnan Longyuan Wind Power Co., Ltd. China 04 Mar 2011
Energy Efficient Power Generation Project by M/s. Panduranga Energy Systems Pvt Limited Panduranga Energy Systems Pvt. Limited India 04 Mar 2011
Huaneng Wuchuan Shilatu Wind Farm Project Carbon Resource Management S.A. China 04 Mar 2011
Labasa Biomass Power Station Environmental Intermediaries & Trading Group Limited Fiji 04 Mar 2011