01:33 07 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
7061-7080
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Natural gas based tri generation project- 1 by Nakoda Limited | Nakoda Limited | India | 10 Mar 2011 |
Bundled solar photovoltaic based power project in India 2 | Videocon Industries Limited | India | 10 Mar 2011 |
Bundled solar photovoltaic based power project in India | Videocon Industries Limited | India | 10 Mar 2011 |
Bundled Wind Power Project- EnKing International (CDM.Dec-10-01) 14 | EnKing International | India | 10 Mar 2011 |
1 MW Solar Power PV project by Rajasthan Renewable Energy Corporation at Phagi, Jaipur | Rajasthan Renewable Energy Corporation Ltd. | India | 10 Mar 2011 |
Xinjiang Kumalake Xiaoshixia hydropower project | Guodian Aksu River Valley Hydropower Development Co., Ltd | China | 10 Mar 2011 |
Greenhouse Gas Emission Reductions through Concentrating Solar Power Technology - Rajasthan Sun Technique Energy Private Limited. | Rajasthan Sun Technique Energy Private Limited. | India | 10 Mar 2011 |
Summit Bibiyana I Grid Connected Natural Gas Combined Cycle Power Plant Project | General Electric Energy | Bangladesh | 10 Mar 2011 |
Zhengdou Hydropower Project | Datang Sichuan Hydropower Co., Ltd. | China | 10 Mar 2011 |
Project for energy efficiency in public buildings in Libreville, Gabon. | Ministry of Budget | Gabon | 10 Mar 2011 |
Bundled solar photovoltaic based power project in India 3 | Videocon Industries Limited | India | 10 Mar 2011 |
Poultry Litter based Power Project by Orient Eco Energy Limited | Orient Eco Energy Limited | India | 10 Mar 2011 |
Yunnan Puer Mengyejiang Hydro Power Project | Yunnan Datang International Electric Power Generation Company Limited | China | 10 Mar 2011 |
GAUTAMI-GODAVARI SMALL HYDRO ELECTRIC PROJECT (1 X 1.2MW) | SAMWAT SYSTEMS PRIVATE LIMITED, PUNE | India | 09 Mar 2011 |
Kiran Energy Solar PV Project | Kiran Energy Solar Power Private Limited | India | 09 Mar 2011 |
Bio-mass based Independent Power Project in West Bengal. | C R Green Power(P) Ltd | India | 09 Mar 2011 |
Fuel switching in Vacuum Distillation Unit and Hot Oil Furnace at Thai Lube Base plant, Chonburi, Thailand | Thai Lube Base Public Company Limited | Thailand | 09 Mar 2011 |
Yunnan Zhilche the 2nd and 3rd cascade Hydro Power Bundle Project | Yunnan Qiaoyuan Hydropower Investment Co.,Ltd. | China | 09 Mar 2011 |
8 MW Cirompang Mini Hydro Power Plants at Bungbulang, Garut, Indonesia | PT Tirta Gemah Ripah | Indonesia | 09 Mar 2011 |
Inner Mongolia Shangdi Wind-farm Project | Chifeng Shenghua New Energy Co., Ltd | China | 08 Mar 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: