18:25 06 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
6961-6980
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Guilin Chongkou Landfill Gas Recovery and Utilization Project | Act Global Environment Technology Co., Ltd. | China | 21 Mar 2011 |
1.25 MW Grid Connected Wind Power Project of M/s Balkrishna Sizing Industries | M/s Balkrishna Sizing Industries | India | 21 Mar 2011 |
Sinchaisri Power Plant | Sinchaisri Co., Ltd. | Thailand | 21 Mar 2011 |
Sinpinyo Bio Power Power Plant | Sinpinyo Bio Power Co., Ltd. | Thailand | 21 Mar 2011 |
Pichai Tahnyachat Power Plant | Pichai Tahnyachat Co., Ltd. | Thailand | 21 Mar 2011 |
Grid connected 25 MW P V solar power project at Charnaka in Gujarat | GMR Gujarat Solar Power Private Limited | India | 21 Mar 2011 |
Shandong Baisida Chemical Co., Ltd. Carbon Black Waste Gas Utilization Project | Shandong Baisida Chemical Co., Ltd. | China | 21 Mar 2011 |
Wind Power Project in Tirupur District | NSL Wind Power Company (Phoolwadi) Pvt. Ltd. | India | 21 Mar 2011 |
0.850 MW Wind Power CDM Project by DML Exim Pvt. Ltd. at Jamnagar, Gujarat, India | DML Exim Pvt. Ltd. | India | 21 Mar 2011 |
Hoa Tham Hydropower Project | Kyoto Energy Pte. Ltd. | Viet Nam | 21 Mar 2011 |
Wind Energy Project - São Bento do Norte - Rodrigo Pedroso Group - Brazil | Rodrigo Pedroso Energia LTDA. | Brazil | 21 Mar 2011 |
Siamthanyachat Power Plant | Siamthanyachat Co., Ltd. | Thailand | 21 Mar 2011 |
CGN Yunnan Mouding Wind Power Project | CGN Chuxiong Mouding Wind Power Co., Ltd. | China | 21 Mar 2011 |
Anhui Laian Baoshan Wind power project | Anhui Longyuan Wind Power Co. Limited | China | 21 Mar 2011 |
Wind Energy Project Sítios Novos - Grupo Rodrigo Pedroso - Brazil | Rodrigo Pedroso Energia LTDA. | Brazil | 21 Mar 2011 |
Biomass-to-liquids - BTL. Pilot biofuel plant using biomass as feedstock | Vale S.A. | Brazil | 21 Mar 2011 |
0.850 MW Wind Power CDM Project by D.R.B. Commodities (India) Pvt. Ltd. at Jamnagar, Gujarat, India | D.R.B. Commodities (India) Pvt. Ltd. | India | 21 Mar 2011 |
Replacement of fossil fuel in the production of clinker in Zaozhuang China United Cement Corporation Ltd. | Zaozhuang China United Cement Corporation Ltd. | China | 21 Mar 2011 |
Tancheng China United Cement Corporation Ltd. Increasing Blend In Cement Production Project | Tancheng China United Cement Corporation Ltd. | China | 21 Mar 2011 |
Inner Mongolia Zhaluteqi Arikunduleng 49.5 MW Wind Farm Project | CPI Carbon Asset Management Co., Ltd. | China | 21 Mar 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: