18:27 06 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
6941-6960
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Waste heat recovery project by Rawan Cement Works | Ultra Tech Cement Limited | India | 23 Mar 2011 |
Emission reductions through renewable power generation | TVH Energy Resource Private Limited | India | 23 Mar 2011 |
Ningxia Electric Power Group Co., Ltd. Taiyangshan Phase II 10 MWp Solar Photovoltaic Power Project | Ningxia Electric Power Group Co., Ltd. | China | 23 Mar 2011 |
Wind Power project at Tamil Nadu by Aartika Cotton Mills | Aartika Cotton Mills | India | 23 Mar 2011 |
Hainan Danzhou Eman Phase II Wind Power Project | Hainan Longyuan Wind Power Co., Ltd | China | 23 Mar 2011 |
Inner Mongolia Chifeng Xidaliang Wind Power Project | Chifeng Wind Power Company of Guodian Inner Mongolia Energy Co., Ltd. | China | 23 Mar 2011 |
Inner Mongolia Chifeng Gangzi Wind Power Project | Chifeng Wind Power Company Guodian Inner Mongolia Energy Co., Ltd. | China | 23 Mar 2011 |
Mapang Boghudiyar Hydro Electric Power Project by Goriganga Hydro Power Private Limited in Uttarakhand State, India | Goriganga Hydro Power Private Limited | India | 23 Mar 2011 |
Inner Mongolia Hohhot Dayuanshan Wind Power Project | Datang (Hohhot) New Energy Co., Ltd. | China | 23 Mar 2011 |
Biomass based cogeneration project in Bihar, India | Shree Vishnu Vishal Paper Mills Pvt. Ltd. | India | 23 Mar 2011 |
Tarabintang 2 x 5 MW Minihydro Power Plant | PT Subur Sari Lastderich | Indonesia | 22 Mar 2011 |
Construction of hydro power plant on Golen Gol Nullah | First Climate (Switzerland) AG | Pakistan | 22 Mar 2011 |
Tinamitra Mandiri 16 MW Gas Power Plant Project Sorong, Indonesia | Swiss Carbon Assets Ltd | Indonesia | 22 Mar 2011 |
Tinamitra Mandiri Flared Gas Reduction Project Sorong, Indonesia | Swiss Carbon Assets Ltd | Indonesia | 22 Mar 2011 |
San Carlos 18 MW Biopower Power Plant | Bronzeoak Philippines, Inc | Philippines | 22 Mar 2011 |
650 KW Small Hydro Electric Project by Lucky Power Projects Co-operative Society Ltd. | Lucky Power Projects Co-operative Society Ltd. | India | 22 Mar 2011 |
Wind power project by UPL, India | Ultramarine & Pigments Ltd. | India | 21 Mar 2011 |
Power Generation from Biomass (wood chip) Gasification | W2E Co Ltd. | Thailand | 21 Mar 2011 |
Wind Energy Project - São Miguel - Grupo Rodrigo Pedroso - Brazil | Rodrigo Pedroso Energia LTDA. | Brazil | 21 Mar 2011 |
Solar Power project at Patan District in Gujarat | Lanco Infratech Limited | India | 21 Mar 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: