Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 256 | 257 | 258 | 259 | 260 | ... 669 >>
Displaying 5141-5160 of 13375 notifications.
Project Title Entity Name Host Party Date Received
Onne Industrial Power Plant Project, Nigeria Energy Company Nigeria PLC Nigeria 21 Sep 2011
Grid Connected Solar Power Project in Maharashtra Maharashtra State Power Generation Co. Ltd. India 21 Sep 2011
Xinjiang Sa'ertamu Wind Power Project Longyuan Habehe Wind Power Co., Ltd. China 21 Sep 2011
Dehradun District CFL Distribution Project Karmanya Energy and Infrastructure PVT.LTD. India 21 Sep 2011
5 X 2 MW Biomass based power project in Uttar Pradesh. A2Z Powercom Limited India 21 Sep 2011
WHRB Captive Power Generation by CSPL Concast Steel & Power Ltd. India 21 Sep 2011
Liquid CO2 production using biomass source at Onda Verde Agrocomercial Onda Verde Agrocomercial S/A Brazil 21 Sep 2011
Gujarat Multi gas Base Chemicals Pvt. Ltd 1.25MW Wind Project 2011 Gujarat Gujarat Multigas Base Chemicals Pvt. Ltd. India 21 Sep 2011
Ikorodu Industrial Power Plant Project, Nigeria Energy Company Nigeria PLC Nigeria 21 Sep 2011
Energy Efficiency Measures in the Administrative Centre of PEMEX PEMEX Mexico 20 Sep 2011
Huaneng Geermu Phase II Solar Power Generation Project Huaneng Geermu Photovoltaic Power Generation Co., Ltd. China 20 Sep 2011
An Phong Wind Power Project Thuan Phong Energy Development JSC. Viet Nam 20 Sep 2011
Huadian Haiyuan Wuyuan First Phase 49.5MW Wind Power Project Huadian Ningxia Liupanshan Wind Power Co., Ltd.; Arreon Carbon trading Limited China 20 Sep 2011
Dominica Wind Farm Project Dominica Energía Limpia, S. de R.L. de C.V. Mexico 20 Sep 2011
ENGEP & BEGREEN CDM Project at UTGR - Jambeiro Landfill ENGEP - Engenharia e Pavimentação Ltda.; BEGREEN Consultoria em Projetos de Bioenergia e Sustentabilidade Ltda. Brazil 20 Sep 2011
Greenhouse Gas Emission Reductions Through Hydro Power - Purthi Hydro Power Pvt. Ltd. M/s Purthi Hydro Power Pvt. Ltd. (a subsidiary of Reliance Power Limited) India. India 20 Sep 2011
Guangdong Xinyi Qianpai Wind Power Project China Resources New Energy (Xinyi) Wind Power Co., Ltd. China 20 Sep 2011
Greenhouse Gas Emission Reductions Through Hydro Power - Sumte Kothang Hydro Power Pvt. Ltd. M/s Sumte Kothang Hydro Power Pvt. Ltd. (a subsidiary of Reliance Power Limited) India. India 20 Sep 2011
Greenhouse Gas Emission Reductions Through Hydro Power - Shangling Hydro Power Pvt. Ltd. M/s Shangling Hydro Power Pvt. Ltd. (a subsidiary of Reliance Power Limited) India. India 20 Sep 2011
Emission reductions through regenerative braking technology L&T Metro Rail (Hyderabad) Limited India 20 Sep 2011