22:25 02 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
5101-5120
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Shuangyashan Yangmugang Wind Power Project | Shuangyashan Yangmugang Wind Power Co., Ltd. | China | 27 Sep 2011 |
Bundled Wind Power Project by EnKing International (EKIESL-CDM.July-11-02) | EKI Energy Services Ltd | India | 26 Sep 2011 |
Methane Capture and On-site Power Generation Phase II Project at Syarikat Cahaya Muda Perak (Oil Mill) Sdn. Bhd. in Tapah, Perak, Malaysia | Syarikat Cahaya Muda Perak (Oil Mill) Sdn. Bhd. | Malaysia | 26 Sep 2011 |
Methane Capture and On-site Power Generation Phase II Project at Sungai Kerang Palm Oil Mill in Sitiawan, Perak, Malaysia | Sungai Kerang Development Sdn. Bhd | Malaysia | 26 Sep 2011 |
Feed Switch from Fuel Oil to Natural Gas Generation of Power in existing power generation facilities at Fertiliser and Chemicals Complex of Mangalore Chemicals and Fertilisers Ltd. at Mangalore in the State of Karnataka in India | Mangalore Chemicals and Fertilisers Limited | India | 26 Sep 2011 |
Zayandehrod regulating dam Hydropower Plant project (HPP) | Sazeh Pardazi Iran Co. & Toseeh Rahbord Energji Co. | Iran (Islamic Republic of) | 26 Sep 2011 |
Tram Tau Hydro Power Project | Tram Tau Hydro Power Joint Stock Company | Viet Nam | 26 Sep 2011 |
Fuel Switch from fuel Oil to Natural Gas for Steam Generation at Fertilisers and Chemicals Complex of Mangalore Chemicals and Fertilisers Ltd., – Mangalore, India | Mangalore Chemicals and Fertilisers Limited | India | 26 Sep 2011 |
SDIC Baiyin Jiancaitang Second Phase 49.5MW Wind Power Project. | Arreon Carbon Trading Limited | China | 26 Sep 2011 |
Huadian Guyuan Yueliangshan Second Phase 49.5MW Wind Power Project | Arreon Carbon Trading Limited | China | 26 Sep 2011 |
Recovery of Waste Heat in the Exhaust gases of the Engines for Generation of Steam at Fertiliser and Chemicals Complex of Mangalore in the State of Karnataka in India | Mangalore Chemicals and Fertilisers Limited | India | 26 Sep 2011 |
Shaanxi Jingbian 20MW grid-connected photovoltaic power generation project | Shaanxi Photovoltaic Industry Co., Ltd. | China | 26 Sep 2011 |
Energy efficient thermal power generation in cement plant | UltraTech Cement Limited | India | 26 Sep 2011 |
Feed and Fuel Switch from Naphtha to natural Gas for producing Ammonia and its derivatives at Fertilisers and Chemicals Complex of Mangalore Chemicals and Fertilisers Ltd.,at Mangalore in the State of Karnataka in India | Mangalore Chemicals and Fertilisers Limited | India | 26 Sep 2011 |
Delsitanisagua Hydroelectric Power Station | Ministerio de Electricidad y Energía Renovable del Ecuador; Corporación Eléctrica del Ecuador –CELEC EP-GENSUR | Ecuador | 24 Sep 2011 |
8.5 MW Solar Photovoltaic Power Project at Jalgaon, Maharashtra, India | Jain Irrigation Systems Limited | India | 24 Sep 2011 |
Emission reductions through recovery and recycling of PET scrap | Sulochana Cotton Spinning Mills Private Limited | India | 24 Sep 2011 |
Landfill Gas Capture project at Navi Mumbai, Maharashtra | Ask Infrastructure Pvt. Ltd | India | 24 Sep 2011 |
Biomass based cogeneration project by Gujarat Ambuja Exports Limited | Gujarat Ambuja Exports Ltd | India | 24 Sep 2011 |
Phuc Son Brick Project | INTRACO Co., Ltd., Vietnam | Viet Nam | 23 Sep 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: