00:18 01 Aug 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
4201-4220
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Manduriacu Hydroelectric Power Station | Ministerio de Electricidad y Energía Renovable del Ecuador; Corporación Eléctrica del Ecuador-CELEC EP | Ecuador | 23 Dec 2011 |
Melting Furnace Modification at NKANA | Konkola Copper Mines plc. | Zambia | 23 Dec 2011 |
Wind Energy Project at Tamil Nadu, India by KIPL | Karmen International Private Limited | India | 23 Dec 2011 |
1.6 MW Wind Power Project CDM project by M/s G. Amphray Laboratories, Sambava Chambers, 4th Floor, Sir P.M. Road, Mumbai - 400 001, India | M/s Amphray Laboratories | India | 23 Dec 2011 |
Sichuan Tingzikou Hydro Project | Jialing River Tingzikou Water Resources and Hydropower Development Co., Ltd | China | 23 Dec 2011 |
Grid connected solar PV power plant in Kutchh district of Gujarat | Unity Power Private Limited | India | 23 Dec 2011 |
Liaoning Beipiao Xiangyang Wind Farm 49.5MW Project | China Resources New Energy (Beipiao) Wind Power Co., Ltd | China | 23 Dec 2011 |
Electricity and heat Generating through cogenerating system in Gerenica Refineria Barrancabermeja (GRB), Ecopetrol, S.A | Gerenica Refinería de Barrancabermeja | Colombia | 23 Dec 2011 |
Electricity generation from renewable sources – Ventos de Santo Dimas, Ventos de São Benedito, Santa Mônica and Santa Úrsula Windfarms | CPFL Energias Renováveis S/A | Brazil | 23 Dec 2011 |
Electricity generation from renewable sources – Campo dos Ventos I, Campo dos Ventos III, Campo dos Ventos V, São Domingos and Ventos de São Martinho Windfarms | CPFL Energias Renováveis S/A | Brazil | 23 Dec 2011 |
Generation of Electricity from 0.6 MW wind turbine in Tirupur District, Tamilnadu, India, by Anitha Textiles | M/s Anitha Textiles | India | 23 Dec 2011 |
Grid Connected Wind Power Project in Gujarat, India | Bharat Forge Ltd | India | 23 Dec 2011 |
Yunnan Zhaotang Hetaoshu Hydropower Project | Zhaotang Dianchuan Energy Development Co., Ltd | China | 22 Dec 2011 |
Development of Project of Clean Development Mechanism with Green Technology for Palm Oil Mill Effluent treatment with Biogas Generation Project at new 90 ton FFB/Hr (Mill of the PT Andes Agro Investama) | PT. Andes Agro Investama of the Poliplant Group | Indonesia | 22 Dec 2011 |
Yunnan Zhaotang Xiaodigou Hydropower Project | Zhaotang Dianchuan Energy Development Co., Ltd | China | 22 Dec 2011 |
Yunnan Zhaotang Chahe Hydropower Project | Zhaotang Dianchuan Energy Development Co., Ltd | China | 22 Dec 2011 |
Zhejiang Zheneng Xiaoshan Natural Gas Cogeneration Project | Zhejiang Xiaoshan Power Plant | China | 22 Dec 2011 |
Yunnan Zhaotang Jinping Hydropower Project | Zhaotang Dianchuan Energy Development Co., Ltd | China | 22 Dec 2011 |
Yunnan Zhaotang Yinpan Hydropower Project | Zhaotang Dianchuan Energy Development Co., Ltd | China | 22 Dec 2011 |
GPCL's 10.5 MW Grid Connected Wind Power Project | Gujarat Power Coroporation Limited | India | 22 Dec 2011 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: